IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0940 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,480 $3,500 Not Implemented
GT0940 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,602 $1,267 Not Implemented
GT0940 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,838 $36,630 Implemented
GT0940 # 06 Y:2020 06 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $83,791 $569,779 Not Implemented
NC0647 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,099 $20,000 Not Implemented
NC0647 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $2,488 $5,708 Not Implemented
NC0647 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $192 $135 Not Implemented
NC0647 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,880 $5,000 Not Implemented
NC0647 # 05 Y:2020 05 2020 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $124,057 $600,000 Not Implemented
LE0486 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $57,024 $500 Not Implemented
LE0486 # 02 Y:2019 02 2019 INSTALL TIMERS AND/OR THERMOSTATS $8,764 $720 Implemented
LE0486 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,174 $1,540 Implemented
LE0486 # 04 Y:2019 04 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $15,202 $21,000 Not Implemented
LE0486 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,256 $65,000 Not Implemented
LE0486 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,726 $7,400 Not Implemented
LE0486 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,558 $28,275 Implemented
SU0485 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,025 $0 Not Implemented
SU0485 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,064 $264 Implemented
SU0485 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $344 $75 Not Implemented
SU0485 # 04 Y:2019 04 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $707 $264 Not Implemented
SU0485 # 05 Y:2019 05 2019 ELIMINATE/REDUCE AN OPERATION $10,786 $6,500 Not Implemented
SU0485 # 06 Y:2019 06 2019 REDUCE VENTILATION AIR $1,310 $944 Not Implemented
SU0485 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,923 $2,832 Implemented
SU0485 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $387 $415 Implemented
SU0485 # 09 Y:2019 09 2019 USE PHOTOCELL CONTROLS $1,305 $1,645 Implemented