Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
183
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0272 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,929 | $250 | Implemented |
MZ0272 # 06 Y:2019 | 06 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,655 | $180 | Implemented |
MZ0272 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $331 | $180 | Not Implemented |
MZ0272 # 09 Y:2019 | 09 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $25,031 | $126,000 | Not Implemented |
MZ0272 # 07 Y:2019 | 07 | 2019 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $31,952 | $68,000 | Not Implemented |
MZ0272 # 02 Y:2019 | 02 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $241 | $105 | Implemented |
MZ0272 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $262 | $1,040 | Not Implemented |
MZ0272 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $2,084 | $1,860 | Implemented |
MZ0272 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,572 | $29,988 | Not Implemented |
MZ0230 # 03 Y:2017 | 03 | 2017 | MINIMIZE WATER USAGE | $199 | $30 | Implemented |
MZ0230 # 05 Y:2017 | 05 | 2017 | INSULATE BARE EQUIPMENT | $3,927 | $1,050 | Implemented |
MZ0230 # 04 Y:2017 | 04 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,896 | $6,500 | Not Implemented |
MZ0230 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,978 | $27,450 | Implemented |
MZ0230 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,308 | $0 | Implemented |
MZ0116 # 05 Y:2013 | 05 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,431 | $1,160 | Not Implemented |
MZ0116 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,715 | $93,750 | Not Implemented |
MZ0116 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $890 | $1,000 | Not Implemented |
MZ0116 # 02 Y:2013 | 02 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,131 | $0 | Not Implemented |
MZ0116 # 01 Y:2013 | 01 | 2013 | USE PHOTOCELL CONTROLS | $2,023 | $900 | Not Implemented |
MZ0067 # 05 Y:2011 | 05 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,674 | $0 | Not Implemented |
MZ0067 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $672 | $230 | Not Implemented |
MZ0067 # 06 Y:2011 | 06 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,200 | $2,200 | Not Implemented |
MZ0067 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,702 | $850 | Not Implemented |
MZ0067 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,468 | $17,620 | Not Implemented |
MZ0067 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,071 | $26,900 | Not Implemented |