IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

247

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0985 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,998 $55,816 Implemented
UD0985 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $320 $1,500 Not Implemented
UD0985 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $938 $0 Not Implemented
UD0985 # 03 Y:2018 03 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $957 $2,500 Implemented
UD0985 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,260 $1,000 Implemented
UD0985 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,113 $0 Implemented
UD0922 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $7,944 $1,500 Not Implemented
UD0922 # 11 Y:2015 11 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,020 $0 Not Implemented
UD0922 # 10 Y:2015 10 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $39,230 $67,300 Not Implemented
UD0922 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,813 $1,000 Not Implemented
UD0922 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,367 $0 Not Implemented
UD0922 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $61,348 $65,000 Not Implemented
UD0922 # 05 Y:2015 05 2015 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $33,724 $600 Not Implemented
UD0922 # 04 Y:2015 04 2015 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $103,649 $29,400 Not Implemented
UD0922 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $122 $140 Not Implemented
UD0922 # 02 Y:2015 02 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,063 $4,947 Not Implemented
UD0922 # 01 Y:2015 01 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,816 $0 Not Implemented
WV0411 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,958 $3,705 Implemented
WV0411 # 04 Y:2010 04 2010 USE RADIANT HEATER FOR SPOT HEATING $2,081 $3,392 Not Implemented
WV0411 # 01 Y:2010 01 2010 REDESIGN PROCESS $11,522 $20,345 Not Implemented
WV0411 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $11,172 $6,123 Implemented
WV0390 # 09 Y:2009 09 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,395 $0 Implemented
WV0390 # 10 Y:2009 10 2009 RECOVER WASTE HEAT FROM EQUIPMENT $5,698 $3,136 Not Implemented
WV0390 # 11 Y:2009 11 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,238 $4,744 Implemented
WV0390 # 12 Y:2009 12 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,219 $582 Not Implemented