Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,257
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0374 # 05 Y:2014 | 05 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $589 | $166 | Not Implemented |
LE0374 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,789 | $57,000 | Not Implemented |
LE0374 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,426 | $9,048 | Not Implemented |
LE0374 # 08 Y:2014 | 08 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $45,444 | $72,000 | Not Implemented |
LE0374 # 09 Y:2014 | 09 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,123 | $2,050 | Not Implemented |
LE0374 # 10 Y:2014 | 10 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $291 | $877 | Not Implemented |
LE0374 # 11 Y:2014 | 11 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $468 | $1,698 | Not Implemented |
NC0497 # 01 Y:2013 | 01 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,740 | $70,400 | Implemented |
NC0497 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,761 | $100 | Implemented |
NC0497 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,793 | $2,250 | Not Implemented |
NC0497 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,827 | $11,647 | Implemented |
NC0497 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $13,386 | $2,785 | Implemented |
NC0497 # 06 Y:2013 | 06 | 2013 | USE PHOTOCELL CONTROLS | $2,032 | $120 | Not Implemented |
NC0497 # 07 Y:2013 | 07 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,053 | $513 | Implemented |
NC0497 # 08 Y:2013 | 08 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $3,513 | $4,256 | Implemented |
NC0497 # 09 Y:2013 | 09 | 2013 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $360 | $650 | Implemented |
MZ0116 # 01 Y:2013 | 01 | 2013 | USE PHOTOCELL CONTROLS | $2,023 | $900 | Not Implemented |
MZ0116 # 02 Y:2013 | 02 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,131 | $0 | Not Implemented |
MZ0116 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $890 | $1,000 | Not Implemented |
MZ0116 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,715 | $93,750 | Not Implemented |
MZ0116 # 05 Y:2013 | 05 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,431 | $1,160 | Not Implemented |
LE0355 # 01 Y:2013 | 01 | 2013 | INSTALL OCCUPANCY SENSORS | $6,254 | $26,400 | Not Implemented |
LE0355 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,383 | $11,830 | Not Implemented |
LE0355 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $803 | $1,900 | Not Implemented |
LE0355 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,970 | $2,640 | Implemented |