IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0194 # 01 Y:2001 01 2001 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $78,182 $160,000 n/a
BD0194 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,963 $2,000 Not Implemented
BD0194 # 03 Y:2001 03 2001 USE RADIANT HEATER FOR SPOT HEATING $14,509 $12,000 Not Implemented
BD0194 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,903 $15,470 n/a
BD0194 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,417 $4,200 Not Implemented
BD0194 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,164 $5,040 Not Implemented
BD0194 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $3,232 $1,875 Not Implemented
BD0194 # 08 Y:2001 08 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,848 $4,000 Not Implemented
BD0194 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $622 $593 Not Implemented
BD0194 # 10 Y:2001 10 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $11,487 $27,000 Not Implemented
BD0194 # 11 Y:2001 11 2001 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,804 $500 Not Implemented
LM0015 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,371 $19,200 Implemented
LM0015 # 02 Y:2001 02 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,951 $550 Implemented
LM0015 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,264 $800 Implemented
LM0015 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,982 $0 Not Implemented
LM0015 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,965 $12,950 Not Implemented
LM0015 # 06 Y:2001 06 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $100,699 $450 Not Implemented
LM0015 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,944 $11,800 Implemented
LM0015 # 08 Y:2001 08 2001 $207,000 $1,000 Not Implemented
LM0015 # 09 Y:2001 09 2001 $7,300 $0 Implemented
LM0015 # 10 Y:2001 10 2001 $104,000 $24,000 Implemented
IC0010 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,637 $8,900 Implemented
IC0010 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,908 $245 Not Implemented
IC0010 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $2,511 $4,312 Implemented
IC0010 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,703 $21,377 n/a