IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0309 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68 $228 Implemented
SU0309 # 06 Y:2011 06 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $68 $287 Not Implemented
SU0309 # 07 Y:2011 07 2011 UPGRADE OBSOLETE EQUIPMENT $116 $1,258 Implemented
SU0309 # 08 Y:2011 08 2011 UPGRADE OBSOLETE EQUIPMENT $1,442 $16,500 Implemented
TT0073 # 01 Y:2011 01 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $13,566 $9,650 Implemented
TT0059 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,600 $38,200 Implemented
TT0059 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,100 $205,600 Implemented
TT0059 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,900 $1,800 Implemented
TT0059 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $6,500 $7,500 Not Implemented
TT0059 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,900 $4,900 Not Implemented
TT0059 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,400 $5 Implemented
GT0875 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,380 $1,500 Implemented
GT0875 # 02 Y:2010 02 2010 USE SYNTHETIC LUBRICANT $4,585 $0 Not Implemented
GT0875 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $899 $1,555 Implemented
GT0875 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,718 $121,175 Implemented
GT0875 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $2,340 $2,940 Implemented
GT0875 # 06 Y:2010 06 2010 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $114,205 $196,875 Not Implemented
GT0877 # 01 Y:2010 01 2010 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $392,100 $250,000 Not Implemented
GT0874 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,133 $1,250 Implemented
GT0874 # 02 Y:2010 02 2010 USE SYNTHETIC LUBRICANT $1,632 $0 Not Implemented
GT0874 # 03 Y:2010 03 2010 USE OPTIMUM THICKNESS INSULATION $53,185 $6,187 Not Implemented
GT0874 # 04 Y:2010 04 2010 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,159 $2,883 Implemented
GT0874 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,038 $20,250 Not Implemented
GT0874 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,115 $38,366 Not Implemented
GT0874 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,744 $119,989 Implemented