IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0874 # 08 Y:2010 08 2010 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $392,100 $177,900 Not Implemented
WV0411 # 01 Y:2010 01 2010 REDESIGN PROCESS $11,522 $20,345 Not Implemented
WV0411 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $11,172 $6,123 Implemented
WV0411 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,958 $3,705 Implemented
WV0411 # 04 Y:2010 04 2010 USE RADIANT HEATER FOR SPOT HEATING $2,081 $3,392 Not Implemented
TT0054 # 01 Y:2010 01 2010 REDUCE VENTILATION AIR $204,750 $50,000 Implemented
TT0054 # 02 Y:2010 02 2010 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $23,040 $10,000 Implemented
TT0054 # 03 Y:2010 03 2010 OPTIMIZE PLANT POWER FACTOR $18,350 $20,000 Implemented
TT0054 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,700 $4,500 Implemented
TT0054 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,240 $4,000 Implemented
TT0054 # 06 Y:2010 06 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $410 $50 Implemented
LE0297 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,029 $785 Implemented
LE0297 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,875 $1,760 Implemented
LE0297 # 03 Y:2010 03 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,903 $3,000 Not Implemented
LE0297 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,627 $66,360 Not Implemented
LE0297 # 05 Y:2010 05 2010 INSTALL TIMERS AND/OR THERMOSTATS $2,326 $450 Not Implemented
LE0297 # 06 Y:2010 06 2010 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,367 $4,500 Not Implemented
LE0297 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,239 $1,000 Not Implemented
LE0297 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $935 $800 Not Implemented
LE0297 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,807 $55,184 Not Implemented
LE0297 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $983 $450 Not Implemented
TT0040 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88,970 $217,270 Not Implemented
TT0040 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,100 $32,390 Not Implemented
TT0040 # 03 Y:2009 03 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $24,648 $0 Implemented
TT0040 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,600 $0 Implemented