IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0004 # 02 Y:2007 02 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,182 $25,800 Implemented
UW0004 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,351 $5,595 Not Implemented
UW0004 # 04 Y:2007 04 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,362 $968 Not Implemented
MA0616 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,636 $132,834 Not Implemented
MA0616 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,128 $3,725 Not Implemented
MA0616 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,603 $2,550 Implemented
MA0616 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $37,450 $12,998 Not Implemented
MA0616 # 05 Y:2007 05 2007 INSTALL TIMERS AND/OR THERMOSTATS $16,346 $1,088 Not Implemented
MA0616 # 06 Y:2007 06 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $709 $300 Not Implemented
UD0757 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $32,124 $0 Implemented
UD0757 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,618 $48,190 Not Implemented
UD0757 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,547 $1,600 Implemented
UD0757 # 04 Y:2007 04 2007 USE OPTIMUM TEMPERATURE $8,681 $0 Not Implemented
UD0757 # 05 Y:2007 05 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,031 $0 Implemented
UD0757 # 06 Y:2007 06 2007 USE OPTIMUM THICKNESS INSULATION $5,633 $606 Not Implemented
UD0757 # 07 Y:2007 07 2007 REDUCE VENTILATION AIR $5,019 $0 Not Implemented
UD0757 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,293 $0 Implemented
UD0757 # 09 Y:2007 09 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,300 $992 Not Implemented
OK0743 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $22,720 $5,010 Implemented
OK0743 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,189 $569 Implemented
OK0743 # 03 Y:2007 03 2007 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $642 $6,000 Implemented
OK0743 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,598 $3,500 Implemented
OK0743 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $21,613 $2,450 Implemented
OK0743 # 06 Y:2007 06 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $24,607 $0 Not Implemented
OK0743 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $5,413 $723 Implemented