IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

154

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0095 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,300 $530 Implemented
TA0095 # 04 Y:2005 04 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,440 $2,000 Not Implemented
TA0095 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,615 $0 Not Implemented
TA0095 # 06 Y:2005 06 2005 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $270 $0 Not Implemented
TA0095 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $0 Not Implemented
TA0095 # 08 Y:2005 08 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $430 $0 Not Implemented
TA0092 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,280 $2,300 Not Implemented
TA0092 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,280 $1,300 Implemented
TA0092 # 03 Y:2005 03 2005 AIR CONDITION ONLY SPACE NECESSARY $3,580 $5 Implemented
TA0092 # 04 Y:2005 04 2005 REDUCE OR ELIMINATE WASTE $2,710 $36 Implemented
TA0092 # 05 Y:2005 05 2005 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,200 $111 Not Implemented
TA0092 # 06 Y:2005 06 2005 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON $1,140 $0 Implemented
TA0092 # 07 Y:2005 07 2005 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $535 $155 Not Implemented
TA0092 # 08 Y:2005 08 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $250 $0 Not Implemented
TA0086 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,742 $0 Not Implemented
TA0086 # 02 Y:2004 02 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,520 $5,800 Not Implemented
TA0086 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,950 $5,000 Not Implemented
TA0086 # 04 Y:2004 04 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,350 $0 Not Implemented
TA0086 # 05 Y:2004 05 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,605 $2,000 Not Implemented
AM0422 # 01 Y:2002 01 2002 AUTOMATE FINISHING PROCESS $47,350 $110,240 Not Implemented
AM0422 # 02 Y:2002 02 2002 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $13,580 $5,270 Implemented
AM0422 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,545 $30 Implemented
AM0422 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $780 $50 Implemented
AM0422 # 05 Y:2002 05 2002 PAY UTILITY BILLS ON TIME $645 $0 Implemented
AM0422 # 06 Y:2002 06 2002 OPTIMIZE PLANT POWER FACTOR $375 $840 Not Implemented