IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0477 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,743 $0 Not Implemented
WI0477 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,524 $855 Not Implemented
WI0477 # 03 Y:2004 03 2004 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $2,765 $605 Not Implemented
WI0477 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,817 $433 Not Implemented
WI0477 # 05 Y:2004 05 2004 INSTALL TIMERS AND/OR THERMOSTATS $923 $0 Not Implemented
WI0477 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $938 $0 Implemented
WI0477 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $582 $0 Not Implemented
UU0063 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $9,695 $28,050 Not Implemented
UU0063 # 02 Y:2004 02 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,316 $6,000 Not Implemented
UU0063 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,810 $5,100 Not Implemented
UU0063 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $212 $385 Not Implemented
UU0063 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,551 $860 Not Implemented
UU0063 # 06 Y:2004 06 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,486 $0 Not Implemented
UU0063 # 07 Y:2004 07 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,123 $360 Not Implemented
UM0253 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,527 $19,692 Implemented
UM0253 # 02 Y:2004 02 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,810 $3,150 Implemented
UM0253 # 03 Y:2004 03 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,558 $750 Implemented
UM0253 # 04 Y:2004 04 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,806 $9,583 Implemented
UM0253 # 05 Y:2004 05 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,055 $1,229 Not Implemented
UM0253 # 06 Y:2004 06 2004 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,580 $810 Implemented
UM0253 # 07 Y:2004 07 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $122 $5 Implemented
WI0467 # 01 Y:2004 01 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $15,905 $15,000 Implemented
WI0467 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,050 $12,800 Not Implemented
WI0467 # 03 Y:2004 03 2004 INSTALL TIMERS AND/OR THERMOSTATS $2,729 $400 Implemented
WI0467 # 04 Y:2004 04 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,231 $300 Implemented