Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,295
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0349 # 02 Y:2003 | 02 | 2003 | INSTALL SKYLIGHTS | $15,856 | $33,200 | n/a |
AS0349 # 03 Y:2003 | 03 | 2003 | INSULATE BARE EQUIPMENT | $6,729 | $9,784 | n/a |
AS0349 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,062 | $56 | Implemented |
AS0349 # 05 Y:2003 | 05 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,556 | $1,316 | Implemented |
AS0349 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,435 | $5,084 | Implemented |
AS0349 # 07 Y:2003 | 07 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,638 | $7,500 | Implemented |
AS0349 # 08 Y:2003 | 08 | 2003 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $878,532 | $1,880,000 | n/a |
AS0349 # 09 Y:2003 | 09 | 2003 | MINIMIZE WATER USAGE | $3,515 | $0 | Implemented |
AS0349 # 10 Y:2003 | 10 | 2003 | MINIMIZE WATER USAGE | $138 | $60 | Implemented |
AS0349 # 11 Y:2003 | 11 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $603,884 | $11,220 | Not Implemented |
UU0037 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,120 | $0 | Not Implemented |
UU0037 # 02 Y:2002 | 02 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $675 | $420 | Not Implemented |
UU0037 # 03 Y:2002 | 03 | 2002 | OPTIMIZE PLANT POWER FACTOR | $1,896 | $2,861 | Not Implemented |
UU0037 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,174 | $20 | Not Implemented |
UU0037 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,586 | $230 | Not Implemented |
AM0422 # 01 Y:2002 | 01 | 2002 | AUTOMATE FINISHING PROCESS | $47,350 | $110,240 | Not Implemented |
AM0422 # 02 Y:2002 | 02 | 2002 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $13,580 | $5,270 | Implemented |
AM0422 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,545 | $30 | Implemented |
AM0422 # 04 Y:2002 | 04 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $780 | $50 | Implemented |
AM0422 # 05 Y:2002 | 05 | 2002 | PAY UTILITY BILLS ON TIME | $645 | $0 | Implemented |
AM0422 # 06 Y:2002 | 06 | 2002 | OPTIMIZE PLANT POWER FACTOR | $375 | $840 | Not Implemented |
AM0422 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $345 | $310 | Implemented |
AM0422 # 08 Y:2002 | 08 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $140 | $50 | Implemented |
MS0215 # 01 Y:2002 | 01 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,023 | $50 | Implemented |
MS0215 # 02 Y:2002 | 02 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,672 | $1,484 | Not Implemented |