IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0023 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,187 $14,750 n/a
IC0023 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $1,046 $501 n/a
IC0023 # 06 Y:2001 06 2001 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $11,745 $14,000 n/a
IC0023 # 07 Y:2001 07 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,070 $2,812 n/a
IC0023 # 08 Y:2001 08 2001 RECOVER AND REUSE WASTE MATERIAL $14,413 $72,000 n/a
SU0108 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,892 $203 Not Implemented
SU0108 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $334 $0 Not Implemented
SU0108 # 03 Y:2001 03 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,590 $22,825 Not Implemented
SU0108 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,399 $0 Not Implemented
SU0108 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $975 $158 Not Implemented
SU0108 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $780 $81 Implemented
SU0108 # 07 Y:2001 07 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,590 $7,000 Implemented
SU0111 # 01 Y:2001 01 2001 PAY UTILITY BILLS ON TIME $605 $0 Not Implemented
SU0111 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $210 $0 Implemented
SU0111 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $345 $0 Implemented
SU0111 # 04 Y:2001 04 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,383 $2,500 Not Implemented
SU0111 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $11,959 $0 Implemented
SU0111 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $358 $60 Not Implemented
SU0111 # 07 Y:2001 07 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,135 $0 Implemented
BD0195 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,060 $28,920 n/a
BD0195 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $15,876 $16,455 n/a
BD0195 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,419 $7,120 Not Implemented
BD0195 # 04 Y:2001 04 2001 USE RADIANT HEATER FOR SPOT HEATING $4,255 $4,000 Not Implemented
BD0195 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $3,191 $1,200 Not Implemented
BD0195 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,345 $1,000 Not Implemented