IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0138 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $187 $197 Implemented
MS0138 # 02 Y:1999 02 1999 SHUT OFF PILOTS IN STANDBY EQUIPMENT $884 $80 Implemented
MS0138 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,777 $1,994 Implemented
MS0138 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,462 $266 Implemented
MS0138 # 05 Y:1999 05 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,832 $3,788 Implemented
MS0138 # 06 Y:1999 06 1999 USE SYNTHETIC LUBRICANT $4,376 $825 Not Implemented
MS0138 # 07 Y:1999 07 1999 BURN WASTE OIL FOR HEAT $1,399 $2,555 Not Implemented
MS0138 # 08 Y:1999 08 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $18,055 $720 Implemented
OR0346 # 01 Y:1999 01 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $129,400 $58,090 Implemented
OR0346 # 02 Y:1999 02 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $44,400 $5,000 Not Implemented
OR0346 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,339 $2,000 Not Implemented
OR0346 # 04 Y:1999 04 1999 UPGRADE CONTROLS ON COMPRESSORS $3,664 $1,430 Not Implemented
OR0346 # 05 Y:1999 05 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,077 $24,750 Not Implemented
WV0170 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,495 $265 Not Implemented
WV0170 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $847 $180 Not Implemented
WV0170 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,864 $600 Implemented
WV0170 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $2,084 $98 Implemented
WV0170 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,095 $4,400 Not Implemented
WV0170 # 06 Y:1999 06 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,114 $300 Implemented
WV0170 # 07 Y:1999 07 1999 INSULATE BARE EQUIPMENT $486 $450 Not Implemented
WV0170 # 08 Y:1999 08 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $750 $40 Not Implemented
WV0170 # 09 Y:1999 09 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,644 $11,000 Not Implemented
WV0170 # 10 Y:1999 10 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $576 $42 Implemented
WV0170 # 11 Y:1999 11 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $16,640 $720 Not Implemented
WV0170 # 12 Y:1999 12 1999 APPLY FOR INVESTMENT INCENTIVES $21,376 $0 Implemented