Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,257
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0660 # 01 Y:1999 | 01 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $56,525 | $880 | Implemented |
TN0660 # 02 Y:1999 | 02 | 1999 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $20,100 | $50,000 | Implemented |
TN0660 # 03 Y:1999 | 03 | 1999 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,247 | $4,700 | Implemented |
TN0660 # 04 Y:1999 | 04 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $5,450 | $0 | Not Implemented |
TN0660 # 05 Y:1999 | 05 | 1999 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $5,360 | $1,070 | Implemented |
TN0660 # 06 Y:1999 | 06 | 1999 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $3,300 | $8,200 | Implemented |
NC0163 # 01 Y:1999 | 01 | 1999 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $11,222 | $17,000 | Implemented |
NC0163 # 02 Y:1999 | 02 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,614 | $1,600 | Implemented |
NC0163 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,866 | $25 | Implemented |
NC0163 # 04 Y:1999 | 04 | 1999 | COVER OPEN TANKS | $24,515 | $21,000 | Not Implemented |
NC0163 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,985 | $35,000 | Not Implemented |
NC0163 # 06 Y:1999 | 06 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,068 | $1,000 | Implemented |
NC0163 # 07 Y:1999 | 07 | 1999 | TREAT AND REUSE RINSE WATERS | $7,389 | $4,500 | Implemented |
NC0163 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $55,000 | $14,000 | Implemented |
MO0253 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,142 | $5,326 | Implemented |
MO0253 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,507 | $5,843 | Not Implemented |
MO0253 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,044 | $40 | Implemented |
MO0253 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,393 | $58 | Implemented |
MO0253 # 05 Y:1999 | 05 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,322 | $0 | Implemented |
MO0253 # 06 Y:1999 | 06 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $63,081 | $12,600 | Not Implemented |
MO0253 # 07 Y:1999 | 07 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $14,000 | $3,700 | Implemented |
MO0253 # 08 Y:1999 | 08 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $329 | $714 | Not Implemented |
MO0252 # 01 Y:1999 | 01 | 1999 | INSTALL SENSORS TO DETECT DEFECTS | $101,434 | $15,624 | Implemented |
MO0252 # 02 Y:1999 | 02 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $5,875 | $10,000 | Implemented |
MO0252 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $422 | $34 | Implemented |