Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,295
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0163 # 08 Y:1999 | 08 | 1999 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,619 | $3,500 | Not Implemented |
WV0163 # 09 Y:1999 | 09 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,854 | $1,075 | Implemented |
WV0163 # 10 Y:1999 | 10 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $49,719 | $11,000 | Implemented |
WV0163 # 11 Y:1999 | 11 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $22,950 | $0 | Implemented |
DS0130 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,448 | $7,644 | Not Implemented |
DS0130 # 02 Y:1999 | 02 | 1999 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $988 | $750 | Not Implemented |
DS0130 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,384 | $2,175 | Not Implemented |
DS0130 # 04 Y:1999 | 04 | 1999 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,845 | $100 | Implemented |
DS0130 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,359 | $300 | Implemented |
DS0130 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $2,683 | $756 | Not Implemented |
DS0130 # 07 Y:1999 | 07 | 1999 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $42,908 | $3,800 | Implemented |
DS0130 # 08 Y:1999 | 08 | 1999 | UPGRADE OBSOLETE EQUIPMENT | $1,750 | $1,000 | Implemented |
DS0130 # 09 Y:1999 | 09 | 1999 | UPGRADE OBSOLETE EQUIPMENT | $8,400 | $55,000 | Implemented |
KU0510 # 01 Y:1998 | 01 | 1998 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,740 | $200 | Implemented |
KU0510 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,400 | $4,710 | Implemented |
KU0510 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,670 | $900 | Implemented |
KU0510 # 04 Y:1998 | 04 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $350 | $1,000 | Implemented |
KU0510 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $310 | $400 | Implemented |
KU0510 # 06 Y:1998 | 06 | 1998 | CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS | $14,350 | $8,630 | Not Implemented |
KU0510 # 07 Y:1998 | 07 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $3,900 | $11,720 | Not Implemented |
KU0510 # 08 Y:1998 | 08 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $1,350 | $2,310 | Implemented |
UD0559 # 01 Y:1998 | 01 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $18,360 | $25,000 | Not Implemented |
UD0559 # 02 Y:1998 | 02 | 1998 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $13,770 | $5,000 | Implemented |
UD0559 # 03 Y:1998 | 03 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,474 | $0 | Not Implemented |
UD0559 # 04 Y:1998 | 04 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,779 | $454 | Not Implemented |