IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0220 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $920 $1,200 Implemented
UU0220 # 05 Y:2023 05 2023 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,160 $50 Implemented
UU0220 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,245 $3,810 Not Implemented
UU0220 # 03 Y:2023 03 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,450 $3,366 Not Implemented
UU0220 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $3,986 $13,500 Implemented
UU0220 # 01 Y:2023 01 2023 USE HEAT PUMP FOR SPACE CONDITIONING $67,069 $0 Implemented
UU0138 # 06 Y:2018 06 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $599 $150 Implemented
UU0138 # 05 Y:2018 05 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $615 $0 Implemented
UU0138 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,089 $1,500 Implemented
UU0138 # 03 Y:2018 03 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,911 $0 Implemented
UU0138 # 02 Y:2018 02 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,044 $2,760 Implemented
UU0138 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,221 $18,137 Implemented
UU0063 # 07 Y:2004 07 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,123 $360 Not Implemented
UU0063 # 06 Y:2004 06 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,486 $0 Not Implemented
UU0063 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,551 $860 Not Implemented
UU0063 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $212 $385 Not Implemented
UU0063 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,810 $5,100 Not Implemented
UU0063 # 02 Y:2004 02 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,316 $6,000 Not Implemented
UU0063 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $9,695 $28,050 Not Implemented
UU0037 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,586 $230 Not Implemented
UU0037 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,174 $20 Not Implemented
UU0037 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $1,896 $2,861 Not Implemented
UU0037 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $675 $420 Not Implemented
UU0037 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,120 $0 Not Implemented