Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
173
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0510 # 06 Y:1998 | 06 | 1998 | CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS | $14,350 | $8,630 | Not Implemented |
UD0559 # 08 Y:1998 | 08 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,492 | $1,060 | Not Implemented |
UD0559 # 07 Y:1998 | 07 | 1998 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,752 | $2,000 | Not Implemented |
UD0559 # 06 Y:1998 | 06 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,782 | $500 | Implemented |
UD0559 # 05 Y:1998 | 05 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $3,469 | $0 | Implemented |
UD0559 # 04 Y:1998 | 04 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,779 | $454 | Not Implemented |
UD0559 # 03 Y:1998 | 03 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,474 | $0 | Not Implemented |
UD0559 # 02 Y:1998 | 02 | 1998 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $13,770 | $5,000 | Implemented |
KU0510 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,400 | $4,710 | Implemented |
KU0510 # 01 Y:1998 | 01 | 1998 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,740 | $200 | Implemented |
KU0510 # 08 Y:1998 | 08 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $1,350 | $2,310 | Implemented |
KU0510 # 07 Y:1998 | 07 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $3,900 | $11,720 | Not Implemented |
KU0510 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $310 | $400 | Implemented |
KU0510 # 04 Y:1998 | 04 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $350 | $1,000 | Implemented |
KU0510 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,670 | $900 | Implemented |
UD0559 # 01 Y:1998 | 01 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $18,360 | $25,000 | Not Implemented |
UD0559 # 09 Y:1998 | 09 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,288 | $0 | Implemented |
MS0119 # 05 Y:1998 | 05 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $109,983 | $0 | Implemented |
MS0119 # 03 Y:1998 | 03 | 1998 | USE SYNTHETIC LUBRICANT | $1,266 | $440 | Implemented |
MS0119 # 10 Y:1998 | 10 | 1998 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $110,250 | $31,460 | Implemented |
MS0119 # 01 Y:1998 | 01 | 1998 | USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY | $24,225 | $7,315 | Not Implemented |
MS0119 # 04 Y:1998 | 04 | 1998 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $32,240 | $31,500 | Implemented |
MS0119 # 06 Y:1998 | 06 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $12,511 | $10,368 | Not Implemented |
MS0119 # 07 Y:1998 | 07 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $12,580 | $31,767 | Not Implemented |
MS0119 # 08 Y:1998 | 08 | 1998 | BURN WASTE OIL FOR HEAT | $26,282 | $24,283 | Not Implemented |