Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
135
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0498 # 06 Y:2001 | 06 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $71,500 | $3,200 | Implemented |
CO0498 # 02 Y:2001 | 02 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,910 | $5,800 | Implemented |
CO0498 # 01 Y:2001 | 01 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,880 | $7,000 | Not Implemented |
CO0498 # 03 Y:2001 | 03 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,110 | $7,530 | Not Implemented |
CO0498 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $380 | $210 | Implemented |
CO0498 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $410 | $0 | Implemented |
SU0120 # 04 Y:2001 | 04 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $160 | $840 | Not Implemented |
SU0120 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,600 | $0 | Not Implemented |
SU0120 # 06 Y:2001 | 06 | 2001 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $21,289 | $75,000 | Not Implemented |
SU0120 # 07 Y:2001 | 07 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $12,567 | $20,000 | Not Implemented |
SU0120 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $188 | $30 | Not Implemented |
SU0120 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $2,537 | $8,750 | Not Implemented |
SU0120 # 01 Y:2001 | 01 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,106 | $0 | Implemented |
IC0023 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $272 | $150 | n/a |
IC0023 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,208 | $14,105 | n/a |
IC0023 # 04 Y:2001 | 04 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,187 | $14,750 | n/a |
IC0023 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $1,046 | $501 | n/a |
IC0023 # 06 Y:2001 | 06 | 2001 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $11,745 | $14,000 | n/a |
IC0023 # 08 Y:2001 | 08 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $14,413 | $72,000 | n/a |
IC0023 # 07 Y:2001 | 07 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,070 | $2,812 | n/a |
IC0023 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,245 | $900 | n/a |
SU0108 # 03 Y:2001 | 03 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,590 | $22,825 | Not Implemented |
SU0108 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $975 | $158 | Not Implemented |
SU0108 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $334 | $0 | Not Implemented |
SU0108 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,399 | $0 | Not Implemented |