IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0321 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,197 $657 Implemented
MZ0321 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,760 $11,000 Implemented
MZ0321 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $46,936 $63,900 Implemented
MZ0321 # 04 Y:2021 04 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $23,778 $5,120 Implemented
MZ0321 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,649 $58,976 Not Implemented
GT0957 # 02 Y:2021 02 2021 AIR CONDITION ONLY SPACE NECESSARY $4,101 $200 Implemented
GT0957 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,872 $1,050 Implemented
GT0957 # 04 Y:2021 04 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,152 $250 Not Implemented
GT0957 # 05 Y:2021 05 2021 INSTALL TIMERS AND/OR THERMOSTATS $3,211 $1,067 Implemented
GT0957 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,036 $38,422 Implemented
GT0957 # 07 Y:2021 07 2021 INSULATE BARE EQUIPMENT $1,020 $813 Not Implemented
GT0957 # 08 Y:2021 08 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $78,031 $737,508 Not Implemented
GT0957 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $17,635 $350 Implemented
IC0246 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,458 $4,300 Not Implemented
IC0246 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,840 $544 Not Implemented
IC0246 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,527 $1,200 Not Implemented
IC0246 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $20,948 $40,000 Not Implemented
IC0246 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $433 $214 Not Implemented
WV0604 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,454 $75,747 Not Implemented
WV0604 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $20,602 $23,284 Implemented
WV0604 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $18,040 $7,122 Implemented
WV0604 # 04 Y:2021 04 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,330 $1,500 Implemented
WV0604 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,431 $403 Implemented
WV0604 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,500 $1,792 Implemented
WV0604 # 07 Y:2021 07 2021 DEVELOP A REPAIR/REPLACE POLICY $1,749 $672 Implemented