Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0321 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,649 | $58,976 | Not Implemented |
MZ0321 # 04 Y:2021 | 04 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $23,778 | $5,120 | Implemented |
MZ0321 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $46,936 | $63,900 | Implemented |
MZ0321 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,760 | $11,000 | Implemented |
MZ0321 # 01 Y:2021 | 01 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,197 | $657 | Implemented |
GT0957 # 02 Y:2021 | 02 | 2021 | AIR CONDITION ONLY SPACE NECESSARY | $4,101 | $200 | Implemented |
GT0957 # 08 Y:2021 | 08 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,031 | $737,508 | Not Implemented |
GT0957 # 07 Y:2021 | 07 | 2021 | INSULATE BARE EQUIPMENT | $1,020 | $813 | Not Implemented |
GT0957 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $17,635 | $350 | Implemented |
GT0957 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,872 | $1,050 | Implemented |
GT0957 # 04 Y:2021 | 04 | 2021 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,152 | $250 | Not Implemented |
GT0957 # 05 Y:2021 | 05 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $3,211 | $1,067 | Implemented |
GT0957 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $53,036 | $38,422 | Implemented |
IC0246 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,458 | $4,300 | Not Implemented |
IC0246 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,840 | $544 | Not Implemented |
IC0246 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,527 | $1,200 | Not Implemented |
IC0246 # 03 Y:2021 | 03 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $20,948 | $40,000 | Not Implemented |
IC0246 # 02 Y:2021 | 02 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $433 | $214 | Not Implemented |
WV0604 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,454 | $75,747 | Not Implemented |
WV0604 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $20,602 | $23,284 | Implemented |
WV0604 # 03 Y:2021 | 03 | 2021 | INSULATE BARE EQUIPMENT | $18,040 | $7,122 | Implemented |
WV0604 # 04 Y:2021 | 04 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,330 | $1,500 | Implemented |
WV0604 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,431 | $403 | Implemented |
WV0604 # 06 Y:2021 | 06 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,500 | $1,792 | Implemented |
WV0604 # 07 Y:2021 | 07 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $1,749 | $672 | Implemented |