IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

617

matching recommendations
Reset
SIC 3561 Pumps And Pumping Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0506 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $680 $0 Not Implemented
CO0506 # 05 Y:2002 05 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,240 $3,630 Not Implemented
CO0506 # 06 Y:2002 06 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,890 $0 Not Implemented
CO0506 # 07 Y:2002 07 2002 DISTILL CONTAMINATED SOLVENTS FOR REUSE $4,300 $5,420 Implemented
AS0320 # 01 Y:2002 01 2002 INSTALL SKYLIGHTS $2,558 $9,946 n/a
AS0320 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,651 $6,651 n/a
AS0320 # 03 Y:2002 03 2002 REDUCE VENTILATION AIR $2,184 $1,320 n/a
AS0320 # 04 Y:2002 04 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,123 $7,350 n/a
AS0320 # 05 Y:2002 05 2002 USE SYNTHETIC LUBRICANT $645 $465 n/a
AS0320 # 06 Y:2002 06 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,380 $60 n/a
AS0320 # 07 Y:2002 07 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,932 $60 n/a
AS0320 # 08 Y:2002 08 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,971 $374 n/a
LM0015 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,371 $19,200 Implemented
LM0015 # 02 Y:2001 02 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,951 $550 Implemented
LM0015 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,264 $800 Implemented
LM0015 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,982 $0 Not Implemented
LM0015 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,965 $12,950 Not Implemented
LM0015 # 06 Y:2001 06 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $100,699 $450 Not Implemented
LM0015 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,944 $11,800 Implemented
LM0015 # 08 Y:2001 08 2001 SCHEDULE DELIVERIES ACCORDING TO DEMAND $207,000 $1,000 Not Implemented
LM0015 # 09 Y:2001 09 2001 CONTRACT OUT MAINTENANCE $7,300 $0 Implemented
LM0015 # 10 Y:2001 10 2001 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $104,000 $24,000 Implemented
OR0346 # 01 Y:1999 01 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $129,400 $58,090 Implemented
OR0346 # 02 Y:1999 02 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $44,400 $5,000 Not Implemented
OR0346 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,339 $2,000 Not Implemented