Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
617
matching recommendationsSIC | 3561 | Pumps And Pumping Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0506 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $680 | $0 | Not Implemented |
CO0506 # 05 Y:2002 | 05 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,240 | $3,630 | Not Implemented |
CO0506 # 06 Y:2002 | 06 | 2002 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $4,890 | $0 | Not Implemented |
CO0506 # 07 Y:2002 | 07 | 2002 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $4,300 | $5,420 | Implemented |
AS0320 # 01 Y:2002 | 01 | 2002 | INSTALL SKYLIGHTS | $2,558 | $9,946 | n/a |
AS0320 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,651 | $6,651 | n/a |
AS0320 # 03 Y:2002 | 03 | 2002 | REDUCE VENTILATION AIR | $2,184 | $1,320 | n/a |
AS0320 # 04 Y:2002 | 04 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,123 | $7,350 | n/a |
AS0320 # 05 Y:2002 | 05 | 2002 | USE SYNTHETIC LUBRICANT | $645 | $465 | n/a |
AS0320 # 06 Y:2002 | 06 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $4,380 | $60 | n/a |
AS0320 # 07 Y:2002 | 07 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,932 | $60 | n/a |
AS0320 # 08 Y:2002 | 08 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $17,971 | $374 | n/a |
LM0015 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,371 | $19,200 | Implemented |
LM0015 # 02 Y:2001 | 02 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $5,951 | $550 | Implemented |
LM0015 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,264 | $800 | Implemented |
LM0015 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,982 | $0 | Not Implemented |
LM0015 # 05 Y:2001 | 05 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,965 | $12,950 | Not Implemented |
LM0015 # 06 Y:2001 | 06 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $100,699 | $450 | Not Implemented |
LM0015 # 07 Y:2001 | 07 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $8,944 | $11,800 | Implemented |
LM0015 # 08 Y:2001 | 08 | 2001 | SCHEDULE DELIVERIES ACCORDING TO DEMAND | $207,000 | $1,000 | Not Implemented |
LM0015 # 09 Y:2001 | 09 | 2001 | CONTRACT OUT MAINTENANCE | $7,300 | $0 | Implemented |
LM0015 # 10 Y:2001 | 10 | 2001 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $104,000 | $24,000 | Implemented |
OR0346 # 01 Y:1999 | 01 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $129,400 | $58,090 | Implemented |
OR0346 # 02 Y:1999 | 02 | 1999 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $44,400 | $5,000 | Not Implemented |
OR0346 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,339 | $2,000 | Not Implemented |