IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3561 Pumps And Pumping Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0520 # 09 Y:1997 09 1997 BURN WASTE OIL FOR HEAT $1,527 $3,990 Not Implemented
OK0520 # 08 Y:1997 08 1997 $18,000 $0 Implemented
OK0520 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $192 $396 Not Implemented
OK0520 # 06 Y:1997 06 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $312 $58 Implemented
OK0520 # 05 Y:1997 05 1997 INSTALL SET-BACK TIMERS $657 $0 Implemented
OK0520 # 01 Y:1997 01 1997 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $16,641 $12,000 Implemented
OK0520 # 02 Y:1997 02 1997 RECOVER AND REUSE WASTE MATERIAL $10,940 $0 Implemented
OK0520 # 03 Y:1997 03 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,039 $2,200 Not Implemented
OK0520 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $795 $522 Not Implemented
HO0159 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $787 $600 Implemented
HO0159 # 06 Y:1997 06 1997 $1,920 $500 Not Implemented
HO0159 # 05 Y:1997 05 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,070 $0 Not Implemented
HO0159 # 04 Y:1997 04 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,080 $6,500 Not Implemented
HO0159 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $296 $20 Implemented
HO0159 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,357 $5,548 Not Implemented
OR0292 # 01 Y:1997 01 1997 $116,300 $0 Implemented
OR0292 # 02 Y:1997 02 1997 USE A DIFFERENT OR RECYCLED RAW MATERIAL $17,850 $0 Implemented
OR0292 # 03 Y:1997 03 1997 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $11,080 $2,000 Implemented
OR0292 # 04 Y:1997 04 1997 USE OTHER WASTE CONCENTRATION METHODS $6,602 $10,000 Not Implemented
OR0292 # 05 Y:1997 05 1997 KEEP BOILER TUBES CLEAN $7,179 $500 Implemented
OR0292 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,202 $1,144 Implemented
OR0292 # 07 Y:1997 07 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $12,370 $23,720 Not Implemented
OR0292 # 08 Y:1997 08 1997 OPTIMIZE PLANT POWER FACTOR $8,246 $28,000 Not Implemented
OR0292 # 09 Y:1997 09 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,215 $23,353 Implemented
OR0292 # 10 Y:1997 10 1997 $250,000 $0 Implemented