IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 3562 Ball And Roller Bearings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0877 # 01 Y:2010 01 2010 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $392,100 $250,000 Not Implemented
GT0874 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,133 $1,250 Implemented
GT0874 # 02 Y:2010 02 2010 USE SYNTHETIC LUBRICANT $1,632 $0 Not Implemented
GT0874 # 03 Y:2010 03 2010 USE OPTIMUM THICKNESS INSULATION $53,185 $6,187 Not Implemented
GT0874 # 04 Y:2010 04 2010 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,159 $2,883 Implemented
GT0874 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,038 $20,250 Not Implemented
GT0874 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,115 $38,366 Not Implemented
GT0874 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,744 $119,989 Implemented
GT0874 # 08 Y:2010 08 2010 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $392,100 $177,900 Not Implemented
GT0744 # 07 Y:2002 07 2002 MODIFY WORKLOAD $27,000 $4,600 Implemented
GT0744 # 06 Y:2002 06 2002 DISCONNECT BALLASTS $2,743 $1,200 Not Implemented
GT0744 # 05 Y:2002 05 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $22,535 $41,250 Implemented
GT0744 # 04 Y:2002 04 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $65,772 $108,000 Not Implemented
GT0744 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,070 $5,050 Not Implemented
GT0744 # 02 Y:2002 02 2002 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,835 $0 Not Implemented
GT0744 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $861 $0 Not Implemented
GT0740 # 05 Y:2002 05 2002 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,122 $1,000 Not Implemented
GT0740 # 07 Y:2002 07 2002 MINIMIZE WATER USAGE $11,020 $21,250 Not Implemented
GT0740 # 06 Y:2002 06 2002 AUTOMATE FINISHING PROCESS $130,680 $10,300 Not Implemented
GT0740 # 04 Y:2002 04 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,365 $0 Not Implemented
GT0740 # 03 Y:2002 03 2002 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $62,171 $130,800 Not Implemented
GT0740 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,056 $2,500 Implemented
GT0740 # 01 Y:2002 01 2002 UPGRADE CONTROLS ON COMPRESSORS $1,545 $0 Implemented
GT0481 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $545 $0 Implemented
GT0481 # 01 Y:1992 01 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,300 $900 Implemented