IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

432

matching recommendations
Reset
SIC 3562 Ball And Roller Bearings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0400 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,602 $2,039 Implemented
BD0400 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $2,250 $1,058 Implemented
GT0877 # 01 Y:2010 01 2010 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $392,100 $250,000 Not Implemented
GT0874 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,133 $1,250 Implemented
GT0874 # 02 Y:2010 02 2010 USE SYNTHETIC LUBRICANT $1,632 $0 Not Implemented
GT0874 # 03 Y:2010 03 2010 USE OPTIMUM THICKNESS INSULATION $53,185 $6,187 Not Implemented
GT0874 # 04 Y:2010 04 2010 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,159 $2,883 Implemented
GT0874 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,038 $20,250 Not Implemented
GT0874 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,115 $38,366 Not Implemented
GT0874 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,744 $119,989 Implemented
GT0874 # 08 Y:2010 08 2010 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $392,100 $177,900 Not Implemented
WV0411 # 01 Y:2010 01 2010 REDESIGN PROCESS $11,522 $20,345 Not Implemented
WV0411 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $11,172 $6,123 Implemented
WV0411 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,958 $3,705 Implemented
WV0411 # 04 Y:2010 04 2010 USE RADIANT HEATER FOR SPOT HEATING $2,081 $3,392 Not Implemented
TT0040 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88,970 $217,270 Not Implemented
TT0040 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,100 $32,390 Not Implemented
TT0040 # 03 Y:2009 03 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $24,648 $0 Implemented
TT0040 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,600 $0 Implemented
TT0040 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,450 $800 Implemented
TT0040 # 06 Y:2009 06 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $39,750 $0 Implemented
TT0040 # 07 Y:2009 07 2009 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $32,280 $40,000 Not Implemented
TT0040 # 08 Y:2009 08 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,000 $0 Implemented
TT0040 # 09 Y:2009 09 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,500 $0 Implemented
WV0390 # 01 Y:2009 01 2009 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $138,137 $122,000 Not Implemented