IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

432

matching recommendations
Reset
SIC 3562 Ball And Roller Bearings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0525 # 02 Y:2006 02 2006 $11,666 $9,000 Not Implemented
WI0525 # 03 Y:2006 03 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,600 $0 Not Implemented
WI0525 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $3,880 $0 Not Implemented
WI0525 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $185 $400 Not Implemented
LE0174 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $16,235 $262 Implemented
LE0174 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,375 $48,722 Implemented
LE0174 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,320 $2,000 Not Implemented
LE0174 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,414 $0 Not Implemented
LE0174 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,251 $200 Implemented
LE0174 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,746 $750 Implemented
LE0174 # 07 Y:2003 07 2003 INSTALL TIMERS AND/OR THERMOSTATS $3,959 $1,050 Implemented
LE0174 # 08 Y:2003 08 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,585 $0 Implemented
LE0174 # 09 Y:2003 09 2003 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $656 $0 Implemented
LE0174 # 10 Y:2003 10 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $229 $1,100 Implemented
LE0174 # 11 Y:2003 11 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $224 $80 Implemented
GT0744 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $861 $0 Not Implemented
GT0744 # 02 Y:2002 02 2002 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,835 $0 Not Implemented
GT0744 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,070 $5,050 Not Implemented
GT0744 # 04 Y:2002 04 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $65,772 $108,000 Not Implemented
GT0744 # 05 Y:2002 05 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $22,535 $41,250 Implemented
GT0744 # 06 Y:2002 06 2002 DISCONNECT BALLASTS $2,743 $1,200 Not Implemented
GT0744 # 07 Y:2002 07 2002 $27,000 $4,600 Implemented
GT0740 # 01 Y:2002 01 2002 UPGRADE CONTROLS ON COMPRESSORS $1,545 $0 Implemented
GT0740 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,056 $2,500 Implemented
GT0740 # 03 Y:2002 03 2002 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $62,171 $130,800 Not Implemented