Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 3562 | Ball And Roller Bearings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0877 # 01 Y:2010 | 01 | 2010 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $392,100 | $250,000 | Not Implemented |
GT0874 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,133 | $1,250 | Implemented |
GT0874 # 02 Y:2010 | 02 | 2010 | USE SYNTHETIC LUBRICANT | $1,632 | $0 | Not Implemented |
GT0874 # 03 Y:2010 | 03 | 2010 | USE OPTIMUM THICKNESS INSULATION | $53,185 | $6,187 | Not Implemented |
GT0874 # 04 Y:2010 | 04 | 2010 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,159 | $2,883 | Implemented |
GT0874 # 05 Y:2010 | 05 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $19,038 | $20,250 | Not Implemented |
GT0874 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,115 | $38,366 | Not Implemented |
GT0874 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,744 | $119,989 | Implemented |
GT0874 # 08 Y:2010 | 08 | 2010 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $392,100 | $177,900 | Not Implemented |
GT0744 # 07 Y:2002 | 07 | 2002 | MODIFY WORKLOAD | $27,000 | $4,600 | Implemented |
GT0744 # 06 Y:2002 | 06 | 2002 | DISCONNECT BALLASTS | $2,743 | $1,200 | Not Implemented |
GT0744 # 05 Y:2002 | 05 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $22,535 | $41,250 | Implemented |
GT0744 # 04 Y:2002 | 04 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $65,772 | $108,000 | Not Implemented |
GT0744 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,070 | $5,050 | Not Implemented |
GT0744 # 02 Y:2002 | 02 | 2002 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $13,835 | $0 | Not Implemented |
GT0744 # 01 Y:2002 | 01 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $861 | $0 | Not Implemented |
GT0740 # 05 Y:2002 | 05 | 2002 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $3,122 | $1,000 | Not Implemented |
GT0740 # 07 Y:2002 | 07 | 2002 | MINIMIZE WATER USAGE | $11,020 | $21,250 | Not Implemented |
GT0740 # 06 Y:2002 | 06 | 2002 | AUTOMATE FINISHING PROCESS | $130,680 | $10,300 | Not Implemented |
GT0740 # 04 Y:2002 | 04 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,365 | $0 | Not Implemented |
GT0740 # 03 Y:2002 | 03 | 2002 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $62,171 | $130,800 | Not Implemented |
GT0740 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,056 | $2,500 | Implemented |
GT0740 # 01 Y:2002 | 01 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $1,545 | $0 | Implemented |
GT0481 # 06 Y:1992 | 06 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $545 | $0 | Implemented |
GT0481 # 01 Y:1992 | 01 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,300 | $900 | Implemented |