Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsSIC | 3562 | Ball And Roller Bearings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0120 # 07 Y:2001 | 07 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $12,567 | $20,000 | Not Implemented |
SU0120 # 06 Y:2001 | 06 | 2001 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $21,289 | $75,000 | Not Implemented |
SU0120 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,600 | $0 | Not Implemented |
SU0120 # 04 Y:2001 | 04 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $160 | $840 | Not Implemented |
SU0120 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $188 | $30 | Not Implemented |
SU0120 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $2,537 | $8,750 | Not Implemented |
SU0120 # 01 Y:2001 | 01 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,106 | $0 | Implemented |
SU0108 # 07 Y:2001 | 07 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,590 | $7,000 | Implemented |
SU0108 # 01 Y:2001 | 01 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,892 | $203 | Not Implemented |
SU0108 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $334 | $0 | Not Implemented |
SU0108 # 03 Y:2001 | 03 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,590 | $22,825 | Not Implemented |
SU0108 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,399 | $0 | Not Implemented |
SU0108 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $975 | $158 | Not Implemented |
SU0108 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $780 | $81 | Implemented |
BD0195 # 08 Y:2001 | 08 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $838 | $400 | Implemented |
BD0195 # 10 Y:2001 | 10 | 2001 | USE EVAPORATION TO CONCENTRATE MATERIAL | $13,105 | $27,000 | n/a |
BD0195 # 09 Y:2001 | 09 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $559 | $541 | Not Implemented |
BD0195 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,345 | $1,000 | Not Implemented |
BD0195 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $3,191 | $1,200 | Not Implemented |
BD0195 # 04 Y:2001 | 04 | 2001 | USE RADIANT HEATER FOR SPOT HEATING | $4,255 | $4,000 | Not Implemented |
BD0195 # 03 Y:2001 | 03 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,419 | $7,120 | Not Implemented |
BD0195 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,876 | $16,455 | n/a |
BD0195 # 01 Y:2001 | 01 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,060 | $28,920 | n/a |
BD0195 # 07 Y:2001 | 07 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,269 | $1,500 | Not Implemented |
BD0194 # 11 Y:2001 | 11 | 2001 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $2,804 | $500 | Not Implemented |