IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168

matching recommendations
Reset
SIC 3563 Air And Gas Compressors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1058 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,990 $11,117 Not Implemented
UD1058 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,188 $0 Not Implemented
UD1058 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $282 $0 Implemented
UD1058 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,636 $952 Implemented
UD1058 # 06 Y:2023 06 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,653 $1,115 Not Implemented
UD1058 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $949 $290 Not Implemented
UD1058 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,307 $29,827 Implemented
UD1058 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $329 $0 Not Implemented
CM1009 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $24,500 $8,000 Not Implemented
CM1009 # 02 Y:2022 02 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,200 $201,300 Implemented
CM1009 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $6,100 $96,500 Not Implemented
CM1009 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,380 $50 Not Implemented
MZ0321 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $46,936 $63,900 Implemented
MZ0321 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,197 $657 Implemented
MZ0321 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,760 $11,000 Implemented
MZ0321 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,649 $58,976 Not Implemented
MZ0321 # 04 Y:2021 04 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $23,778 $5,120 Implemented
UF0562 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $2,645 $4,780 Implemented
UF0562 # 06 Y:2020 06 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,545 $1,778 Implemented
UF0562 # 04 Y:2020 04 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,128 $7,733 Not Implemented
UF0562 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,271 $0 Implemented
UF0562 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $30,571 $24,600 Not Implemented
UF0562 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,635 $4,086 Implemented
UF0562 # 08 Y:2020 08 2020 USE PHOTOCELL CONTROLS $904 $0 Implemented
UF0562 # 07 Y:2020 07 2020 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,484 $2,380 Not Implemented