Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
676
matching recommendationsSIC | 3564 | Blowers And Fans |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1087 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $3,614 | $6,258 | n/a |
UD1087 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,975 | $0 | n/a |
UD1087 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,335 | $1,068 | n/a |
UD1087 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $399 | $1,254 | n/a |
UD1087 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $684 | $0 | n/a |
UD1087 # 07 Y:2024 | 07 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $303 | $900 | n/a |
UD1087 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $452 | $487 | n/a |
UD1087 # 08 Y:2024 | 08 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $601 | $2,093 | n/a |
UL2313 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $95,755 | $917,406 | Not Implemented |
UL2313 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,515 | $14,625 | Not Implemented |
UL2313 # 06 Y:2023 | 06 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,989 | $15,000 | Not Implemented |
UL2313 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,566 | $0 | Not Implemented |
UL2313 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,325 | $2,880 | Not Implemented |
UL2313 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,411 | $30,977 | Not Implemented |
UL2310 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,694 | $540 | Not Implemented |
UL2310 # 02 Y:2023 | 02 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,283 | $0 | Not Implemented |
UL2310 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $145,022 | $23,878 | Not Implemented |
UL2310 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $550 | $2,438 | Not Implemented |
UL2310 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,462 | $0 | Not Implemented |
UL2310 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $159,497 | $1,065,693 | Not Implemented |
CI0009 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $4,832 | $4,725 | n/a |
CI0009 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,574 | $0 | n/a |
CI0009 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,199 | $1,500 | n/a |
CI0009 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,281 | $14,880 | n/a |
CI0009 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,339 | $196,478 | n/a |