IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 3564 Blowers And Fans
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0315 # 06 Y:2022 06 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $16,735 $15,782 Implemented
MZ0315 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $3,818 $360 Implemented
MZ0315 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,247 $250 Implemented
MZ0315 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,771 $14,420 Implemented
MZ0315 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,404 $480 Implemented
MZ0230 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $3,927 $1,050 Implemented
MZ0230 # 03 Y:2017 03 2017 MINIMIZE WATER USAGE $199 $30 Implemented
MZ0230 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,308 $0 Implemented
MZ0230 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,978 $27,450 Implemented
MO0252 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $422 $34 Implemented
MO0252 # 01 Y:1999 01 1999 INSTALL SENSORS TO DETECT DEFECTS $101,434 $15,624 Implemented
MO0252 # 02 Y:1999 02 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,875 $10,000 Implemented
MO0252 # 07 Y:1999 07 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,877 $4,372 Implemented
MO0252 # 08 Y:1999 08 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,674 $3,340 Implemented
MO0224 # 10 Y:1998 10 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,064 $0 Implemented
MO0224 # 01 Y:1998 01 1998 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $7,972 $20,000 Implemented
MO0224 # 02 Y:1998 02 1998 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $26,928 $50,000 Implemented
MO0224 # 03 Y:1998 03 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $4,300 $10,000 Implemented
MO0224 # 04 Y:1998 04 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,660 $3,700 Implemented
MO0224 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,640 $18,440 Implemented
MO0224 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $199 $345 Implemented
MO0224 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $486 $1,042 Implemented
MO0224 # 09 Y:1998 09 1998 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,439 $10,327 Implemented
MO0224 # 08 Y:1998 08 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $984 $61 Implemented
MO0106 # 06 Y:1994 06 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $838 $175 Implemented