Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
60
matching recommendationsSIC | 3564 | Blowers And Fans |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0315 # 06 Y:2022 | 06 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $16,735 | $15,782 | Implemented |
MZ0315 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $3,818 | $360 | Implemented |
MZ0315 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,247 | $250 | Implemented |
MZ0315 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,771 | $14,420 | Implemented |
MZ0315 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,404 | $480 | Implemented |
MZ0230 # 05 Y:2017 | 05 | 2017 | INSULATE BARE EQUIPMENT | $3,927 | $1,050 | Implemented |
MZ0230 # 03 Y:2017 | 03 | 2017 | MINIMIZE WATER USAGE | $199 | $30 | Implemented |
MZ0230 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,308 | $0 | Implemented |
MZ0230 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,978 | $27,450 | Implemented |
MO0252 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $422 | $34 | Implemented |
MO0252 # 01 Y:1999 | 01 | 1999 | INSTALL SENSORS TO DETECT DEFECTS | $101,434 | $15,624 | Implemented |
MO0252 # 02 Y:1999 | 02 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $5,875 | $10,000 | Implemented |
MO0252 # 07 Y:1999 | 07 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,877 | $4,372 | Implemented |
MO0252 # 08 Y:1999 | 08 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,674 | $3,340 | Implemented |
MO0224 # 10 Y:1998 | 10 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,064 | $0 | Implemented |
MO0224 # 01 Y:1998 | 01 | 1998 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $7,972 | $20,000 | Implemented |
MO0224 # 02 Y:1998 | 02 | 1998 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $26,928 | $50,000 | Implemented |
MO0224 # 03 Y:1998 | 03 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $4,300 | $10,000 | Implemented |
MO0224 # 04 Y:1998 | 04 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $3,660 | $3,700 | Implemented |
MO0224 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,640 | $18,440 | Implemented |
MO0224 # 07 Y:1998 | 07 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $199 | $345 | Implemented |
MO0224 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $486 | $1,042 | Implemented |
MO0224 # 09 Y:1998 | 09 | 1998 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,439 | $10,327 | Implemented |
MO0224 # 08 Y:1998 | 08 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $984 | $61 | Implemented |
MO0106 # 06 Y:1994 | 06 | 1994 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $838 | $175 | Implemented |