IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

676

matching recommendations
Reset
SIC 3564 Blowers And Fans
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0138 # 05 Y:1999 05 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,832 $3,788 Implemented
MS0138 # 06 Y:1999 06 1999 USE SYNTHETIC LUBRICANT $4,376 $825 Not Implemented
MS0138 # 07 Y:1999 07 1999 BURN WASTE OIL FOR HEAT $1,399 $2,555 Not Implemented
MS0138 # 08 Y:1999 08 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $18,055 $720 Implemented
NC0163 # 01 Y:1999 01 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $11,222 $17,000 Implemented
NC0163 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,614 $1,600 Implemented
NC0163 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,866 $25 Implemented
NC0163 # 04 Y:1999 04 1999 COVER OPEN TANKS $24,515 $21,000 Not Implemented
NC0163 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $19,985 $35,000 Not Implemented
NC0163 # 06 Y:1999 06 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,068 $1,000 Implemented
NC0163 # 07 Y:1999 07 1999 TREAT AND REUSE RINSE WATERS $7,389 $4,500 Implemented
NC0163 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $55,000 $14,000 Implemented
MO0252 # 01 Y:1999 01 1999 INSTALL SENSORS TO DETECT DEFECTS $101,434 $15,624 Implemented
MO0252 # 02 Y:1999 02 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,875 $10,000 Implemented
MO0252 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $422 $34 Implemented
MO0252 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,134 $4,647 Not Implemented
MO0252 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,315 $53 Not Implemented
MO0252 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,006 $40 Not Implemented
MO0252 # 07 Y:1999 07 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,877 $4,372 Implemented
MO0252 # 08 Y:1999 08 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,674 $3,340 Implemented
WV0163 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,261 $132 Implemented
WV0163 # 03 Y:1999 03 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,997 $1,290 Implemented
WV0163 # 04 Y:1999 04 1999 BURN A LESS EXPENSIVE GRADE OF FUEL $4,974 $6,400 Not Implemented
WV0163 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $3,844 $390 Implemented
WV0163 # 06 Y:1999 06 1999 RECOVER WASTE HEAT FROM EQUIPMENT $947 $616 Not Implemented