IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

189

matching recommendations
Reset
SIC 3567 Industrial Furnaces And Ovens
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0295 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,897 $44,225 Not Implemented
TT0295 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $646 $2,610 Not Implemented
TT0295 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,010 $1,360 Not Implemented
TT0295 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,115 $20,000 Not Implemented
UU0220 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,245 $3,810 Not Implemented
UU0220 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $3,986 $13,500 Implemented
UU0220 # 03 Y:2023 03 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,450 $3,366 Not Implemented
UU0220 # 01 Y:2023 01 2023 USE HEAT PUMP FOR SPACE CONDITIONING $67,069 $0 Implemented
UU0220 # 05 Y:2023 05 2023 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,160 $50 Implemented
UU0220 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $920 $1,200 Implemented
BD0422 # 06 Y:2013 06 2013 USE SYNTHETIC LUBRICANT $633 $300 Not Implemented
BD0422 # 01 Y:2013 01 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,352 $400 Not Implemented
BD0422 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,187 $25 Not Implemented
BD0422 # 02 Y:2013 02 2013 USE RADIANT HEATER FOR SPOT HEATING $11,658 $28,800 Not Implemented
BD0422 # 03 Y:2013 03 2013 USE SYNTHETIC LUBRICANT $4,219 $4,219 Not Implemented
BD0422 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $610 $1,000 Not Implemented
BD0422 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $530 $500 Not Implemented
BD0422 # 09 Y:2013 09 2013 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $17,739 $4,600 Not Implemented
BD0422 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $2,518 $3,225 Not Implemented
WI0467 # 04 Y:2004 04 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,231 $300 Implemented
WI0467 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,050 $12,800 Not Implemented
WI0467 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $345 $640 Implemented
WI0467 # 01 Y:2004 01 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $15,905 $15,000 Implemented
WI0467 # 03 Y:2004 03 2004 INSTALL TIMERS AND/OR THERMOSTATS $2,729 $400 Implemented
WI0467 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $601 $0 Not Implemented