Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
286
matching recommendationsSIC | 3568 | Power Transmission Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0312 # 04 Y:2011 | 04 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,822 | $177 | Not Implemented |
SU0312 # 03 Y:2011 | 03 | 2011 | DISCONNECT BALLASTS | $1,584 | $0 | Implemented |
SU0312 # 02 Y:2011 | 02 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,162 | $0 | Not Implemented |
SU0312 # 01 Y:2011 | 01 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,080 | $0 | Implemented |
MA0616 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,636 | $132,834 | Not Implemented |
MA0616 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,128 | $3,725 | Not Implemented |
MA0616 # 03 Y:2007 | 03 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,603 | $2,550 | Implemented |
MA0616 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $37,450 | $12,998 | Not Implemented |
MA0616 # 05 Y:2007 | 05 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $16,346 | $1,088 | Not Implemented |
MA0616 # 06 Y:2007 | 06 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $709 | $300 | Not Implemented |
UD0757 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,618 | $48,190 | Not Implemented |
UD0757 # 04 Y:2007 | 04 | 2007 | USE OPTIMUM TEMPERATURE | $8,681 | $0 | Not Implemented |
UD0757 # 05 Y:2007 | 05 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,031 | $0 | Implemented |
UD0757 # 06 Y:2007 | 06 | 2007 | USE OPTIMUM THICKNESS INSULATION | $5,633 | $606 | Not Implemented |
UD0757 # 07 Y:2007 | 07 | 2007 | REDUCE VENTILATION AIR | $5,019 | $0 | Not Implemented |
UD0757 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,547 | $1,600 | Implemented |
UD0757 # 08 Y:2007 | 08 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,293 | $0 | Implemented |
UD0757 # 09 Y:2007 | 09 | 2007 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,300 | $992 | Not Implemented |
UD0757 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $32,124 | $0 | Implemented |
MA0611 # 09 Y:2007 | 09 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $504 | $3,600 | Not Implemented |
MA0611 # 05 Y:2007 | 05 | 2007 | USE OPTIMUM TEMPERATURE | $6,194 | $12,675 | Not Implemented |
MA0611 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,486 | $186,840 | Not Implemented |
MA0611 # 03 Y:2007 | 03 | 2007 | REDUCE VENTILATION AIR | $23,954 | $17,587 | Implemented |
MA0611 # 04 Y:2007 | 04 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,443 | $17,876 | Not Implemented |
MA0611 # 07 Y:2007 | 07 | 2007 | INSULATE BARE EQUIPMENT | $3,330 | $3,300 | Implemented |