IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

286

matching recommendations
Reset
SIC 3568 Power Transmission Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0460 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $22,135 $42,000 Not Implemented
MA0460 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,240 $26,115 Not Implemented
MA0460 # 04 Y:2000 04 2000 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $5,388 $13,800 Implemented
MA0460 # 05 Y:2000 05 2000 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $4,828 $1,960 Implemented
MA0460 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,880 $32,900 Implemented
MA0460 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,435 $300 Implemented
MA0460 # 08 Y:2000 08 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,423 $1,070 Implemented
MA0460 # 09 Y:2000 09 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $815 $3,075 Not Implemented
MA0460 # 10 Y:2000 10 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $815 $300 Implemented
MO0253 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,142 $5,326 Implemented
MO0253 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,507 $5,843 Not Implemented
MO0253 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,044 $40 Implemented
MO0253 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,393 $58 Implemented
MO0253 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,322 $0 Implemented
MO0253 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $63,081 $12,600 Not Implemented
MO0253 # 07 Y:1999 07 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $14,000 $3,700 Implemented
MO0253 # 08 Y:1999 08 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $329 $714 Not Implemented
DS0130 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,448 $7,644 Not Implemented
DS0130 # 02 Y:1999 02 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $988 $750 Not Implemented
DS0130 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $3,384 $2,175 Not Implemented
DS0130 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,845 $100 Implemented
DS0130 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,359 $300 Implemented
DS0130 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $2,683 $756 Not Implemented
DS0130 # 07 Y:1999 07 1999 REPLACE CLOTH RAGS WITH PAPER TOWELS $42,908 $3,800 Implemented
DS0130 # 08 Y:1999 08 1999 UPGRADE OBSOLETE EQUIPMENT $1,750 $1,000 Implemented