Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
286
matching recommendationsSIC | 3568 | Power Transmission Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0460 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $22,135 | $42,000 | Not Implemented |
MA0460 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,240 | $26,115 | Not Implemented |
MA0460 # 04 Y:2000 | 04 | 2000 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $5,388 | $13,800 | Implemented |
MA0460 # 05 Y:2000 | 05 | 2000 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $4,828 | $1,960 | Implemented |
MA0460 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,880 | $32,900 | Implemented |
MA0460 # 07 Y:2000 | 07 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,435 | $300 | Implemented |
MA0460 # 08 Y:2000 | 08 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,423 | $1,070 | Implemented |
MA0460 # 09 Y:2000 | 09 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $815 | $3,075 | Not Implemented |
MA0460 # 10 Y:2000 | 10 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $815 | $300 | Implemented |
MO0253 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,142 | $5,326 | Implemented |
MO0253 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,507 | $5,843 | Not Implemented |
MO0253 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,044 | $40 | Implemented |
MO0253 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,393 | $58 | Implemented |
MO0253 # 05 Y:1999 | 05 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,322 | $0 | Implemented |
MO0253 # 06 Y:1999 | 06 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $63,081 | $12,600 | Not Implemented |
MO0253 # 07 Y:1999 | 07 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $14,000 | $3,700 | Implemented |
MO0253 # 08 Y:1999 | 08 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $329 | $714 | Not Implemented |
DS0130 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,448 | $7,644 | Not Implemented |
DS0130 # 02 Y:1999 | 02 | 1999 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $988 | $750 | Not Implemented |
DS0130 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,384 | $2,175 | Not Implemented |
DS0130 # 04 Y:1999 | 04 | 1999 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,845 | $100 | Implemented |
DS0130 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,359 | $300 | Implemented |
DS0130 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $2,683 | $756 | Not Implemented |
DS0130 # 07 Y:1999 | 07 | 1999 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $42,908 | $3,800 | Implemented |
DS0130 # 08 Y:1999 | 08 | 1999 | UPGRADE OBSOLETE EQUIPMENT | $1,750 | $1,000 | Implemented |