IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

458

matching recommendations
Reset
SIC 3569 General Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0156 # 05 Y:1989 05 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,240 $800 Implemented
CO0156 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $277 $105 Implemented
CO0156 # 07 Y:1989 07 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $635 $2,480 Implemented
CO0156 # 08 Y:1989 08 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,470 $1,800 Not Implemented
CO0156 # 09 Y:1989 09 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,131 $5,000 Not Implemented
CO0156 # 10 Y:1989 10 1989 INSULATE BARE EQUIPMENT $660 $500 Not Implemented
MA0151 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,228 $426 Not Implemented
MA0151 # 02 Y:1989 02 1989 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,218 $305 Not Implemented
MA0151 # 03 Y:1989 03 1989 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $4,308 $243 Not Implemented
MA0151 # 04 Y:1989 04 1989 BURN A LESS EXPENSIVE GRADE OF FUEL $12,509 $15,150 Implemented
MA0151 # 05 Y:1989 05 1989 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,022 $593 Implemented
MA0151 # 06 Y:1989 06 1989 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $1,093 $592 Not Implemented
MA0151 # 07 Y:1989 07 1989 RECOVER WASTE HEAT FROM EQUIPMENT $2,050 $3,150 Not Implemented
MA0139 # 01 Y:1988 01 1988 INSTALL TIMERS AND/OR THERMOSTATS $6,928 $2,859 Implemented
MA0139 # 02 Y:1988 02 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,534 $85,000 Implemented
MA0139 # 03 Y:1988 03 1988 OPTIMIZE PLANT POWER FACTOR $19,447 $9,000 Implemented
MA0139 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,222 $3,943 Not Implemented
MA0139 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,467 $72,797 Not Implemented
KU0259 # 01 Y:1988 01 1988 INSTALL SET-BACK TIMERS $1,275 $227 Implemented
KU0259 # 02 Y:1988 02 1988 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $7,290 $0 Not Implemented
KU0259 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $495 $215 Not Implemented
KU0259 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $390 $120 Implemented
KU0259 # 05 Y:1988 05 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $330 $30 Implemented
KU0259 # 06 Y:1988 06 1988 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $323 $0 Implemented
KU0259 # 07 Y:1988 07 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $285 $0 Implemented