Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 3569 | General Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0110 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $969 | $262 | Not Implemented |
TA0110 # 06 Y:2005 | 06 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,362 | $0 | Not Implemented |
TA0110 # 05 Y:2005 | 05 | 2005 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,083 | $5,319 | Not Implemented |
TA0110 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,880 | $1,080 | Not Implemented |
TA0110 # 03 Y:2005 | 03 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,925 | $0 | Not Implemented |
TA0110 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $6,850 | $13,700 | Not Implemented |
TA0110 # 01 Y:2005 | 01 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,425 | $0 | Not Implemented |
SD0369 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,896 | $10,102 | Implemented |
SD0369 # 08 Y:2005 | 08 | 2005 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $12,744 | $17,000 | Not Implemented |
SD0369 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $285 | $161 | Implemented |
SD0369 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $395 | $80 | Implemented |
SD0369 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,877 | $12,575 | Not Implemented |
SD0369 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,639 | $648 | Not Implemented |
SD0369 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,291 | $0 | Implemented |
SD0369 # 01 Y:2005 | 01 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $169,717 | $252,000 | Not Implemented |
GT0802 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $220 | $300 | Implemented |
GT0802 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,780 | $5,000 | Implemented |
GT0802 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,100 | $0 | Implemented |
GT0802 # 05 Y:2005 | 05 | 2005 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,820 | $60 | Not Implemented |
GT0802 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,610 | $6,510 | Implemented |
GT0802 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,610 | $2,800 | Not Implemented |
GT0802 # 02 Y:2005 | 02 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $18,100 | $10,800 | Implemented |