IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 3569 General Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0028 # 08 Y:2023 08 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $490 $1,162 Not Implemented
MU0028 # 07 Y:2023 07 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $550 $776 Not Implemented
MU0028 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $643 $1,100 Implemented
MU0028 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $863 $112 Implemented
MU0028 # 04 Y:2023 04 2023 USE PHOTOCELL CONTROLS $138 $348 Implemented
MU0028 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,919 $0 Implemented
MU0028 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,322 $0 Not Implemented
MU0028 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,186 $0 Implemented
SU0531 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,557 $0 n/a
SU0531 # 11 Y:2023 11 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,818 $8,523 n/a
SU0531 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,464 $0 n/a
SU0531 # 04 Y:2023 04 2023 DISCONNECT BALLASTS $603 $0 n/a
SU0531 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,436 $70 n/a
SU0531 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $102 n/a
SU0531 # 07 Y:2023 07 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,355 $156 n/a
SU0531 # 08 Y:2023 08 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $32,789 $29,395 n/a
SU0531 # 09 Y:2023 09 2023 RECOVER WASTE HEAT FROM EQUIPMENT $428 $528 n/a
SU0531 # 10 Y:2023 10 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,531 $2,041 n/a
SU0531 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,031 $0 n/a
WM0196 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,026 $0 Implemented
WM0196 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,584 $0 Implemented
WM0196 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $2,381 $1,240 Not Implemented
WM0196 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,020 $1,490 Implemented
WM0196 # 05 Y:2023 05 2023 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $546 $213 Implemented
WM0196 # 06 Y:2023 06 2023 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $544 $240 Not Implemented