IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

442

matching recommendations
Reset
SIC 357 Computer And Office Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0122 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $1,465 $3,975 Not Implemented
LM0122 # 04 Y:2007 04 2007 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $19,128 $5,500 Implemented
LM0122 # 05 Y:2007 05 2007 MODIFY WORKLOAD $9,311 $4,850 Implemented
OR0500 # 01 Y:2006 01 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,000 $31,500 Implemented
OR0500 # 02 Y:2006 02 2006 INSTALL COMMON HEADER ON COMPRESSORS $36,300 $31,500 Implemented
OR0500 # 03 Y:2006 03 2006 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $39,400 $42,000 Implemented
OR0500 # 04 Y:2006 04 2006 MINIMIZE WATER USAGE $51,600 $105,000 Not Implemented
OR0500 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $16,600 $10,100 Not Implemented
OR0500 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $15,000 $4,800 Not Implemented
OR0500 # 07 Y:2006 07 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,400 $1,200 Not Implemented
AS0420 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,359 $18,572 Implemented
AS0420 # 02 Y:2006 02 2006 UPGRADE CONTROLS ON COMPRESSORS $2,260 $10,000 Not Implemented
AS0420 # 03 Y:2006 03 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,254 $3,300 Not Implemented
AS0420 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,765 $1,000 Not Implemented
AS0420 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,338 $5,000 Implemented
AS0420 # 06 Y:2006 06 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $885 $13,820 Implemented
UF0376 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,968 $27,399 Not Implemented
UF0376 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,222 $2,053 Not Implemented
UF0376 # 03 Y:2006 03 2006 ADD AREA LIGHTING SWITCHES $878 $2,646 Not Implemented
UF0376 # 04 Y:2006 04 2006 INSTALL BACK-UP EQUIPMENT $1,632,456 $5,315 Not Implemented
UF0376 # 05 Y:2006 05 2006 AIR CONDITION ONLY SPACE NECESSARY $1,014 $3,200 Not Implemented
UF0376 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $150 $1,480 Not Implemented
UF0376 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $369 $0 Not Implemented
UF0376 # 08 Y:2006 08 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $148 $0 Not Implemented
AS0399 # 01 Y:2005 01 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $200,000 $19,000 Not Implemented