IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

775

matching recommendations
Reset
SIC 358 Refrigeration And Service Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0260 # 04 Y:2004 04 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,159 $1,159 Implemented
BD0260 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,427 $3,000 Implemented
BD0260 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,226 $1,000 Implemented
BD0260 # 07 Y:2004 07 2004 INSTALL TURBULATORS $1,553 $3,500 Implemented
BD0260 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,267 $656 Implemented
BD0260 # 09 Y:2004 09 2004 INSTALL AUTOMATIC STACK DAMPER $991 $1,500 Implemented
BD0260 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $547 $551 Implemented
BD0260 # 11 Y:2004 11 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $312 $670 Implemented
BD0260 # 12 Y:2004 12 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $377 $1,000 Implemented
BD0260 # 13 Y:2004 13 2004 USE POWER DURING OFF-PEAK PERIODS $1,766 $0 Implemented
UM0239 # 01 Y:2003 01 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $247,018 $270,000 Implemented
UM0239 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $82,330 $148,050 Implemented
UM0239 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $35,180 $1,100 Implemented
UM0239 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,815 $300 Implemented
OK0661 # 02 Y:2003 02 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $20,400 $0 Implemented
OK0661 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,319 $823 Implemented
OK0661 # 08 Y:2003 08 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,061 $45,000 Implemented
OK0661 # 09 Y:2003 09 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $11,440 $2,500 Implemented
UM0232 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,683 $2,100 Implemented
UM0232 # 05 Y:2003 05 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,693 $1,000 Implemented
UM0232 # 06 Y:2003 06 2003 INSTALL COMMON HEADER ON COMPRESSORS $13,700 $6,480 Implemented
TA0048 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,000 $24,409 Implemented
TA0048 # 02 Y:2003 02 2003 INSTALL SYSTEM TO COLLECT SCRAP $6,700 $82 Implemented
TA0048 # 03 Y:2003 03 2003 REPAIR AND ELIMINATE STEAM LEAKS $6,390 $1,045 Implemented
TA0048 # 04 Y:2003 04 2003 AIR CONDITION ONLY SPACE NECESSARY $6,360 $0 Implemented