Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
775
matching recommendationsSIC | 358 | Refrigeration And Service Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0260 # 04 Y:2004 | 04 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,159 | $1,159 | Implemented |
BD0260 # 05 Y:2004 | 05 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,427 | $3,000 | Implemented |
BD0260 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,226 | $1,000 | Implemented |
BD0260 # 07 Y:2004 | 07 | 2004 | INSTALL TURBULATORS | $1,553 | $3,500 | Implemented |
BD0260 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,267 | $656 | Implemented |
BD0260 # 09 Y:2004 | 09 | 2004 | INSTALL AUTOMATIC STACK DAMPER | $991 | $1,500 | Implemented |
BD0260 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $547 | $551 | Implemented |
BD0260 # 11 Y:2004 | 11 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $312 | $670 | Implemented |
BD0260 # 12 Y:2004 | 12 | 2004 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $377 | $1,000 | Implemented |
BD0260 # 13 Y:2004 | 13 | 2004 | USE POWER DURING OFF-PEAK PERIODS | $1,766 | $0 | Implemented |
UM0239 # 01 Y:2003 | 01 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $247,018 | $270,000 | Implemented |
UM0239 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $82,330 | $148,050 | Implemented |
UM0239 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $35,180 | $1,100 | Implemented |
UM0239 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,815 | $300 | Implemented |
OK0661 # 02 Y:2003 | 02 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $20,400 | $0 | Implemented |
OK0661 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,319 | $823 | Implemented |
OK0661 # 08 Y:2003 | 08 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,061 | $45,000 | Implemented |
OK0661 # 09 Y:2003 | 09 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $11,440 | $2,500 | Implemented |
UM0232 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42,683 | $2,100 | Implemented |
UM0232 # 05 Y:2003 | 05 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,693 | $1,000 | Implemented |
UM0232 # 06 Y:2003 | 06 | 2003 | INSTALL COMMON HEADER ON COMPRESSORS | $13,700 | $6,480 | Implemented |
TA0048 # 01 Y:2003 | 01 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,000 | $24,409 | Implemented |
TA0048 # 02 Y:2003 | 02 | 2003 | INSTALL SYSTEM TO COLLECT SCRAP | $6,700 | $82 | Implemented |
TA0048 # 03 Y:2003 | 03 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $6,390 | $1,045 | Implemented |
TA0048 # 04 Y:2003 | 04 | 2003 | AIR CONDITION ONLY SPACE NECESSARY | $6,360 | $0 | Implemented |