IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,655

matching recommendations
Reset
SIC 358 Refrigeration And Service Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0333 # 03 Y:2006 03 2006 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $7,142 $1,000 Not Implemented
NC0333 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,756 $50 Not Implemented
NC0333 # 05 Y:2006 05 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,913 $300 Implemented
NC0333 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $395 $150 Implemented
NC0333 # 07 Y:2006 07 2006 DEVELOP A REPAIR/REPLACE POLICY $135 $185 Implemented
NC0333 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $278 $100 Implemented
NC0333 # 09 Y:2006 09 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,628 $3,000 Not Implemented
NC0333 # 10 Y:2006 10 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,550 $4,000 Not Implemented
AS0414 # 01 Y:2006 01 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $813,934 $3,030,000 Not Implemented
AS0414 # 02 Y:2006 02 2006 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $28,518 $20,000 Implemented
AS0414 # 03 Y:2006 03 2006 PAY BILLS ON TIME TO AVOID LATE FEES $17,731 $200 Implemented
OR0498 # 01 Y:2006 01 2006 COVER OPEN TANKS $7,300 $3,600 Implemented
OR0498 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,300 $0 Not Implemented
OR0498 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $2,300 Implemented
OR0498 # 04 Y:2006 04 2006 UPGRADE CONTROLS ON COMPRESSORS $1,450 $1,800 Not Implemented
OR0498 # 05 Y:2006 05 2006 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $600 $400 Implemented
OR0498 # 06 Y:2006 06 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,400 $20,000 Implemented
OR0498 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,600 $17,400 Implemented
AS0410 # 01 Y:2005 01 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $7,503 $6,000 Not Implemented
AS0410 # 02 Y:2005 02 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,150 $6,600 Not Implemented
AS0410 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,623 $100 Implemented
AS0410 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $0 $5,538 Implemented
AS0410 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,056 $1,000 Implemented
AS0410 # 06 Y:2005 06 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,603 $7,200 Not Implemented
AS0410 # 07 Y:2005 07 2005 USE SOLAR HEAT TO HEAT WATER $591 $3,200 Not Implemented