IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 358 Refrigeration And Service Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0942 # 07 Y:2016 07 2016 REDUCE VENTILATION AIR $1,533 $0 Not Implemented
UD0942 # 05 Y:2016 05 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,803 $9,350 Not Implemented
UD0942 # 04 Y:2016 04 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,967 $4,500 Not Implemented
UD0942 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $2,012 $810 Not Implemented
UD0942 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $245 $35 Not Implemented
UD0942 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,296 $50 Not Implemented
UD0942 # 06 Y:2016 06 2016 REDUCE VENTILATION AIR $7,691 $28,200 Not Implemented
UD0942 # 08 Y:2016 08 2016 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,368 $0 Not Implemented
UD0461 # 06 Y:1995 06 1995 USE EVAPORATION TO CONCENTRATE MATERIAL $14,223 $20,000 Implemented
UD0461 # 05 Y:1995 05 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,483 $1,000 Implemented
UD0461 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,525 $14,640 Implemented
UD0461 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,923 $0 Implemented
UD0461 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,758 $45,000 Implemented
UD0461 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,437 $0 Implemented
UD0457 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,446 $0 Implemented
UD0457 # 01 Y:1995 01 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,868 $200 Implemented
UD0457 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $612 $2,000 Not Implemented
UD0457 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $687 $1,625 Implemented
ND0173 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,980 $7,920 Implemented
ND0173 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,411 $3,071 Implemented
ND0173 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,420 $1,000 Implemented
ND0173 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $220 $280 Implemented
ND0173 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $550 $250 Implemented
UD0246 # 05 Y:1988 05 1988 INSULATE BARE EQUIPMENT $4,414 $3,400 Implemented
UD0246 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,261 $0 Implemented