Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
60
matching recommendationsSIC | 358 | Refrigeration And Service Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0358 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,466 | $200 | Not Implemented |
WI0358 # 01 Y:1999 | 01 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $97,790 | $44,000 | Implemented |
WI0358 # 02 Y:1999 | 02 | 1999 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $92,705 | $0 | Not Implemented |
WI0358 # 03 Y:1999 | 03 | 1999 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $54,425 | $102,000 | Not Implemented |
WI0358 # 04 Y:1999 | 04 | 1999 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $7,803 | $13,900 | Not Implemented |
WI0358 # 07 Y:1999 | 07 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $331 | $107 | Implemented |
WI0358 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $1,096 | $3,850 | Not Implemented |
CO0443 # 08 Y:1999 | 08 | 1999 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $31,200 | $8,000 | Implemented |
CO0443 # 07 Y:1999 | 07 | 1999 | BURN WASTE OIL FOR HEAT | $17,150 | $10,500 | Not Implemented |
CO0443 # 06 Y:1999 | 06 | 1999 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $2,210 | $1,000 | Implemented |
CO0443 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,660 | $530 | Implemented |
CO0443 # 04 Y:1999 | 04 | 1999 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,760 | $2,000 | Implemented |
CO0443 # 03 Y:1999 | 03 | 1999 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $7,900 | $250 | Implemented |
CO0443 # 02 Y:1999 | 02 | 1999 | REDUCE VENTILATION AIR | $11,050 | $12,600 | Not Implemented |
CO0443 # 01 Y:1999 | 01 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $16,960 | $0 | Implemented |
IA0223 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,841 | $0 | n/a |
IA0223 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,129 | $275 | n/a |
IA0223 # 08 Y:1999 | 08 | 1999 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $70,029 | $25,372 | n/a |
IA0223 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,282 | $653 | n/a |
IA0223 # 05 Y:1999 | 05 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $741 | $50 | n/a |
IA0223 # 01 Y:1999 | 01 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,307 | $2,670 | n/a |
IA0223 # 06 Y:1999 | 06 | 1999 | INSTALL OCCUPANCY SENSORS | $144 | $732 | n/a |
IA0223 # 07 Y:1999 | 07 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $17,424 | $7,400 | n/a |
IA0223 # 10 Y:1999 | 10 | 1999 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $3,779 | $1,400 | n/a |
IA0223 # 09 Y:1999 | 09 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $40,016 | $218 | n/a |