Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
72
matching recommendationsSIC | 3582 | Commercial Laundry Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0529 # 02 Y:2023 | 02 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,834 | $0 | Not Implemented |
SU0529 # 08 Y:2023 | 08 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,392 | $24,000 | Not Implemented |
SU0529 # 09 Y:2023 | 09 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $99 | $494 | Not Implemented |
SU0529 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,318 | $2,488 | Not Implemented |
SU0529 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $158 | $274 | Not Implemented |
SU0529 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,544 | $39,388 | Not Implemented |
SU0529 # 01 Y:2023 | 01 | 2023 | DISCONNECT BALLASTS | $670 | $0 | Not Implemented |
SU0529 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,688 | $6,050 | Not Implemented |
SU0529 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,775 | $250 | Not Implemented |
TT0158 # 03 Y:2015 | 03 | 2015 | INCREASE AMOUNT OF CONDENSATE RETURNED | $4,000 | $150 | Not Implemented |
TT0158 # 04 Y:2015 | 04 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,406 | $5,000 | Not Implemented |
TT0158 # 07 Y:2015 | 07 | 2015 | DISCONNECT BALLASTS | $139 | $139 | Not Implemented |
TT0158 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,995 | $50,374 | Not Implemented |
TT0158 # 02 Y:2015 | 02 | 2015 | INSULATE BARE EQUIPMENT | $4,934 | $7,361 | Implemented |
TT0158 # 05 Y:2015 | 05 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $2,256 | $400 | Not Implemented |
TT0158 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $761 | $1,000 | Not Implemented |
BS0025 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $626 | $495 | Not Implemented |
BS0025 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $208 | $1,211 | Not Implemented |
BS0025 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $444 | $15 | Not Implemented |
BS0025 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $829 | $977 | Not Implemented |
BS0025 # 02 Y:2013 | 02 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,537 | $6,138 | Not Implemented |
BS0025 # 01 Y:2013 | 01 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,335 | $1,104 | Not Implemented |
SU0241 # 03 Y:2006 | 03 | 2006 | CONVERT TO ELECTROSTATIC POWDER COATING | $15,419 | $4,500 | Not Implemented |
SU0241 # 07 Y:2006 | 07 | 2006 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $602 | $712 | Not Implemented |
SU0241 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,985 | $0 | Not Implemented |