IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
SIC 3582 Commercial Laundry Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0529 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,834 $0 Not Implemented
SU0529 # 08 Y:2023 08 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,392 $24,000 Not Implemented
SU0529 # 09 Y:2023 09 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $99 $494 Not Implemented
SU0529 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,318 $2,488 Not Implemented
SU0529 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $158 $274 Not Implemented
SU0529 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $23,544 $39,388 Not Implemented
SU0529 # 01 Y:2023 01 2023 DISCONNECT BALLASTS $670 $0 Not Implemented
SU0529 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,688 $6,050 Not Implemented
SU0529 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,775 $250 Not Implemented
TT0158 # 03 Y:2015 03 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $4,000 $150 Not Implemented
TT0158 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,406 $5,000 Not Implemented
TT0158 # 07 Y:2015 07 2015 DISCONNECT BALLASTS $139 $139 Not Implemented
TT0158 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,995 $50,374 Not Implemented
TT0158 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $4,934 $7,361 Implemented
TT0158 # 05 Y:2015 05 2015 REPAIR AND ELIMINATE STEAM LEAKS $2,256 $400 Not Implemented
TT0158 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $761 $1,000 Not Implemented
BS0025 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $626 $495 Not Implemented
BS0025 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $208 $1,211 Not Implemented
BS0025 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $444 $15 Not Implemented
BS0025 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $829 $977 Not Implemented
BS0025 # 02 Y:2013 02 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,537 $6,138 Not Implemented
BS0025 # 01 Y:2013 01 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,335 $1,104 Not Implemented
SU0241 # 03 Y:2006 03 2006 CONVERT TO ELECTROSTATIC POWDER COATING $15,419 $4,500 Not Implemented
SU0241 # 07 Y:2006 07 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $602 $712 Not Implemented
SU0241 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,985 $0 Not Implemented