Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 3585 | Refrigeration And Heating Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0442 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,002 | $70 | Implemented |
MI0442 # 02 Y:2024 | 02 | 2024 | METER WASTE WATER | $13,483 | $956 | Implemented |
MI0442 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $16,134 | $240 | Implemented |
MI0375 # 01 Y:2020 | 01 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,722 | $20,153 | Implemented |
MI0375 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,712 | $2,100 | Implemented |
MI0375 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,932 | $4,843 | Implemented |
MI0375 # 06 Y:2020 | 06 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $939 | $280 | Implemented |
MI0375 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $617 | $1,522 | Implemented |
MI0375 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $339 | $984 | Implemented |
MI0305 # 08 Y:2016 | 08 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $380 | $780 | Implemented |
MI0305 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,922 | $1,700 | Implemented |
MI0305 # 11 Y:2016 | 11 | 2016 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $35 | $19 | Implemented |
MI0305 # 10 Y:2016 | 10 | 2016 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $203 | $50 | Implemented |
UF0411 # 05 Y:2008 | 05 | 2008 | INSTALL OCCUPANCY SENSORS | $1,200 | $215 | Implemented |
UF0411 # 04 Y:2008 | 04 | 2008 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $3,258 | $461 | Implemented |
UF0411 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,287 | $40,292 | Implemented |
UF0411 # 09 Y:2008 | 09 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $53,144 | $426 | Implemented |
UF0411 # 13 Y:2008 | 13 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $110,982 | $0 | Implemented |
UF0059 # 01 Y:1993 | 01 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,474 | $6,866 | Implemented |
UF0059 # 05 Y:1993 | 05 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,647 | $8,906 | Implemented |
UF0059 # 06 Y:1993 | 06 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,031 | $1,450 | Implemented |
UF0059 # 07 Y:1993 | 07 | 1993 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,420 | $4,440 | Implemented |
UF0010 # 04 Y:1991 | 04 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,610 | $0 | Implemented |
UF0010 # 03 Y:1991 | 03 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $121 | $149 | Implemented |
UF0010 # 02 Y:1991 | 02 | 1991 | INSTALL SET-BACK TIMERS | $185 | $192 | Implemented |