IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3585 Refrigeration And Heating Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0458 # 09 Y:2014 09 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,360 $37,774 Not Implemented
SF0458 # 08 Y:2014 08 2014 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,900 $0 Implemented
SF0458 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $1,683 $6,142 Not Implemented
SF0458 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $459 $1,384 Implemented
SF0458 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,813 $30,411 Not Implemented
SF0458 # 04 Y:2014 04 2014 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,582 $522 Implemented
SF0458 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $2,339 $0 Implemented
SF0458 # 02 Y:2014 02 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,195 $0 Not Implemented
SF0458 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $6,859 $840 Implemented
SD0463 # 04 Y:2013 04 2013 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,768 $2,210 Implemented
SD0463 # 07 Y:2013 07 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $467 $200 Not Implemented
SD0463 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $564 $200 Not Implemented
SD0463 # 05 Y:2013 05 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,233 $5,250 Not Implemented
SD0463 # 03 Y:2013 03 2013 USE PHOTOCELL CONTROLS $2,625 $1,850 Not Implemented
SD0463 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,131 $6,224 Not Implemented
SD0463 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,304 $1,500 Not Implemented
SD0181 # 01 Y:1997 01 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,363 $2,363 Implemented
SD0181 # 10 Y:1997 10 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $37,200 $24,000 Not Implemented
SD0181 # 09 Y:1997 09 1997 EXPAND OPERATIONS INTO UNUSED SPACE $22,500 $49,750 Not Implemented
SD0181 # 08 Y:1997 08 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $25,182 $9,000 Implemented
SD0181 # 07 Y:1997 07 1997 WASH AND REUSE RAGS ON-SITE $1,262 $1,600 Implemented
SD0181 # 06 Y:1997 06 1997 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS $2,462 $0 Implemented
SD0181 # 05 Y:1997 05 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $22,100 $9,000 Implemented
SD0181 # 04 Y:1997 04 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $744 $1,190 Implemented
SD0181 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,773 $6,741 Implemented