IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 3585 Refrigeration And Heating Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0652 # 01 Y:2020 01 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,160 $100 Not Implemented
NC0652 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $631 $700 Implemented
NC0652 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $465 $390 Implemented
NC0652 # 04 Y:2020 04 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,865 $500 Implemented
NC0652 # 05 Y:2020 05 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $40,922 $1,000 Not Implemented
NC0652 # 06 Y:2020 06 2020 CONDENSE OPERATION INTO ONE BUILDING $6,086 $4,800 Not Implemented
TN0694 # 11 Y:2000 11 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,365 $0 Implemented
TN0694 # 01 Y:2000 01 2000 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $219,860 $100,000 Not Implemented
TN0694 # 02 Y:2000 02 2000 ADD AREA LIGHTING SWITCHES $17,510 $25,030 Implemented
TN0694 # 03 Y:2000 03 2000 DEVELOP A REPAIR/REPLACE POLICY $10,755 $5,075 Implemented
TN0694 # 04 Y:2000 04 2000 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $10,130 $181,580 Not Implemented
TN0694 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $8,665 $26,260 Not Implemented
TN0694 # 06 Y:2000 06 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,210 $18,900 Not Implemented
TN0694 # 07 Y:2000 07 2000 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $4,345 $9,100 Not Implemented
TN0694 # 08 Y:2000 08 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $3,600 $7,000 Not Implemented
TN0694 # 09 Y:2000 09 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $2,795 $1,875 Not Implemented
TN0694 # 10 Y:2000 10 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,185 $3,570 Not Implemented
NC0080 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $566 $1,600 Implemented
NC0080 # 08 Y:1996 08 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $200 $100 Not Implemented
NC0080 # 07 Y:1996 07 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,700 $1,800 Not Implemented
NC0080 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,518 $9,807 Not Implemented
NC0080 # 04 Y:1996 04 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $246 $600 Not Implemented
NC0080 # 03 Y:1996 03 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $414 $600 Implemented
NC0080 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $302 $100 Not Implemented
NC0080 # 01 Y:1996 01 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $93 $180 Implemented