IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 3585 Refrigeration And Heating Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0019 # 06 Y:2001 06 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $161 $140 Not Implemented
TA0019 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $1,015 $346 Implemented
TA0019 # 04 Y:2001 04 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $5,184 $5,331 Implemented
TA0019 # 03 Y:2001 03 2001 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,994 $3,000 Not Implemented
TA0019 # 02 Y:2001 02 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,836 $225 Implemented
TA0019 # 01 Y:2001 01 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $27,478 $2,805 Not Implemented
OK0614 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $377 $3,700 Not Implemented
OK0614 # 01 Y:2001 01 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,325 $335 Not Implemented
OK0614 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,500 $6,100 Not Implemented
OK0614 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $5,656 $9,700 Implemented
OK0614 # 05 Y:2001 05 2001 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $9,100 $4,000 Implemented
IC0001 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,986 $68,895 Implemented
IC0001 # 12 Y:2001 12 2001 INSTALL AN UNINTERUPTABLE POWER SUPPLY $300,000 $840,000 Implemented
IC0001 # 11 Y:2001 11 2001 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $612,000 $900,000 Not Implemented
IC0001 # 10 Y:2001 10 2001 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $367,200 $826,000 Not Implemented
IC0001 # 09 Y:2001 09 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $110,160 $64 Not Implemented
IC0001 # 08 Y:2001 08 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,227 $3,266 Implemented
AM0393 # 01 Y:2001 01 2001 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $10,300 $0 Not Implemented
IC0001 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $228 $1,370 Implemented
IC0001 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $1,478 $3,204 Implemented
IC0001 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $855 $0 Implemented
IC0001 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,387 $2,500 Implemented
IC0001 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,032 $700 Implemented
IC0001 # 01 Y:2001 01 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $3,732 $0 Implemented
AM0393 # 10 Y:2001 10 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $2,570 Not Implemented