Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 3585 | Refrigeration And Heating Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0458 # 01 Y:2014 | 01 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $6,859 | $840 | Implemented |
SF0458 # 02 Y:2014 | 02 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,195 | $0 | Not Implemented |
SF0458 # 03 Y:2014 | 03 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,339 | $0 | Implemented |
SF0458 # 04 Y:2014 | 04 | 2014 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,582 | $522 | Implemented |
SF0458 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,813 | $30,411 | Not Implemented |
SF0458 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $459 | $1,384 | Implemented |
SF0458 # 09 Y:2014 | 09 | 2014 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,360 | $37,774 | Not Implemented |
SF0458 # 08 Y:2014 | 08 | 2014 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $3,900 | $0 | Implemented |
SF0458 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $1,683 | $6,142 | Not Implemented |
BS0042 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,472 | $8,031 | Implemented |
BS0042 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,494 | $175 | Implemented |
BS0042 # 06 Y:2014 | 06 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,668 | $9,641 | Not Implemented |
BS0042 # 05 Y:2014 | 05 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,973 | $3,120 | Implemented |
BS0042 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,955 | $450 | Implemented |
BS0042 # 03 Y:2014 | 03 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,279 | $17,525 | Not Implemented |
BS0042 # 02 Y:2014 | 02 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,441 | $42,000 | Implemented |
NC0524 # 13 Y:2014 | 13 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $818 | $180 | Implemented |
NC0524 # 11 Y:2014 | 11 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $1,126 | $1,050 | Implemented |
NC0524 # 10 Y:2014 | 10 | 2014 | USE PHOTOCELL CONTROLS | $54 | $40 | Implemented |
NC0524 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,264 | $42,866 | Implemented |
NC0524 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,056 | $100 | Implemented |
NC0524 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,368 | $100 | Implemented |
NC0524 # 04 Y:2014 | 04 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $7,341 | $29,000 | Not Implemented |
NC0524 # 05 Y:2014 | 05 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $606 | $300 | Implemented |
NC0524 # 06 Y:2014 | 06 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,243 | $475 | Implemented |