Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
SIC 3589 Service Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0286 # 14 Y:1997 14 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $527 $328 Not Implemented
WI0286 # 13 Y:1997 13 1997 INSTALL OCCUPANCY SENSORS $575 $450 Not Implemented
WI0286 # 11 Y:1997 11 1997 MINIMIZE WATER USAGE $274 $0 Not Implemented
WI0286 # 01 Y:1997 01 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $29,011 $1,000 Not Implemented
WI0286 # 02 Y:1997 02 1997 REDUCE VENTILATION AIR $6,908 $1,000 Not Implemented
WI0286 # 03 Y:1997 03 1997 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS $2,999 $1,000 Not Implemented
WI0286 # 04 Y:1997 04 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,138 $5,000 Not Implemented
WI0286 # 05 Y:1997 05 1997 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $26,499 $0 Not Implemented
WI0286 # 06 Y:1997 06 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $19,520 $88,000 Not Implemented
WI0286 # 07 Y:1997 07 1997 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,085 $15,000 Not Implemented
WI0286 # 08 Y:1997 08 1997 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,230 $10,230 Not Implemented
WI0286 # 09 Y:1997 09 1997 INSTALL TIMERS AND/OR THERMOSTATS $18,978 $3,600 Not Implemented
WI0286 # 10 Y:1997 10 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,310 $210 Not Implemented
WI0156 # 09 Y:1992 09 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $142 $640 Implemented
WI0156 # 01 Y:1992 01 1992 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,451 $0 Implemented
WI0156 # 02 Y:1992 02 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,308 $10,000 Implemented
WI0156 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $2 Implemented
WI0156 # 04 Y:1992 04 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $622 $1 Implemented
WI0156 # 05 Y:1992 05 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $184 $0 Implemented
WI0156 # 06 Y:1992 06 1992 INSTALL AUTOMATIC STACK DAMPER $452 $500 Not Implemented
WI0156 # 07 Y:1992 07 1992 SHUT OFF PILOTS IN STANDBY EQUIPMENT $136 $0 Implemented
WI0156 # 08 Y:1992 08 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $205 $150 Not Implemented
WI0156 # 10 Y:1992 10 1992 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $106 $150 Not Implemented
WI0019 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $1,190 $0 Not Implemented
WI0019 # 05 Y:1988 05 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,248 $5,600 Not Implemented