Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
982
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0078 # 05 Y:1986 | 05 | 1986 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $827 | $240 | Implemented |
MA0078 # 06 Y:1986 | 06 | 1986 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $14,610 | $22,000 | Implemented |
UD0194 # 01 Y:1986 | 01 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,611 | $12,000 | Implemented |
UD0194 # 02 Y:1986 | 02 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,065 | $1,160 | Implemented |
UD0194 # 03 Y:1986 | 03 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,063 | $1,000 | Implemented |
UD0194 # 04 Y:1986 | 04 | 1986 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,352 | $1,500 | Implemented |
ST0050 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $415 | $100 | Implemented |
ST0050 # 03 Y:1985 | 03 | 1985 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $179 | $122 | Implemented |
ST0050 # 04 Y:1985 | 04 | 1985 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $279 | $500 | Implemented |
ST0050 # 05 Y:1985 | 05 | 1985 | USE COMPRESSOR AIR FILTERS | $49 | $0 | Implemented |
ST0050 # 07 Y:1985 | 07 | 1985 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,195 | $0 | Implemented |
UD0152 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $749 | $99 | Implemented |
OK0076 # 01 Y:1983 | 01 | 1983 | OPTIMIZE PLANT POWER FACTOR | $173 | $550 | Implemented |
OK0076 # 02 Y:1983 | 02 | 1983 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $40 | $228 | Implemented |
OK0076 # 03 Y:1983 | 03 | 1983 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $433 | $120 | Implemented |
OK0076 # 04 Y:1983 | 04 | 1983 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $172 | $386 | Implemented |
OK0083 # 01 Y:1983 | 01 | 1983 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,427 | $3,265 | Implemented |
OK0083 # 02 Y:1983 | 02 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $26,153 | $3,160 | Implemented |
OK0083 # 03 Y:1983 | 03 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $3,118 | $1,600 | Implemented |
OK0083 # 04 Y:1983 | 04 | 1983 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,097 | $200 | Implemented |
OK0083 # 05 Y:1983 | 05 | 1983 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $323 | $730 | Implemented |
OK0083 # 06 Y:1983 | 06 | 1983 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $454 | $130 | Implemented |
OK0083 # 07 Y:1983 | 07 | 1983 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $16,433 | $34,221 | Implemented |
OK0083 # 08 Y:1983 | 08 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $469 | $127 | Implemented |
UD0061 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $72 | $0 | Implemented |