IAC logo
IAC Assessment: WI0036
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0036
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1988
Principal Product HYDRAULIC CYLINDERS
NAICS n/a
SIC 3593 - Fluid Power Cylinders & Actuators
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 0
Annual Production 6,000 Pieces
Production Hrs. Annual 4,675
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $120,395 1,890,973 kWh $0.06
Natural Gas $33,512 6,468 MMBtu $5.18
TOTAL ENERGY COSTS $153,907
RECOMMENDED SAVINGS* $20,186 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,615
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$4,529
Cost:
-
$4,529 71,219 - - - - $4,529
71,219
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,402
Cost:
-
$1,402 21,981 - - - - $1,402
21,981
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$793
Cost:
$234
$793 12,603 - - - - $793
12,603
kWh
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$824
Cost:
$500
- - $1,124 217 $(-300) - -
-
kWh
$1,124
217
MMBtu
$(-300)
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$751
Cost:
$1,300
$1,150 18,171 $(-399) (-77) - - $1,150
18,171
kWh
$(-399)
(-77)
MMBtu
-
-
$
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,820
Cost:
$5,000
$2,820 - - - - - $2,820
-
kWh
-
-
MMBtu
-
-
$
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$4,459
Cost:
-
$4,459 - - - - - $4,459
-
kWh
-
-
MMBtu
-
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,608
Cost:
$5,500
- - $4,808 928 $(-200) - -
-
kWh
$4,808
928
MMBtu
$(-200)
-
$
TOTAL RECOMMENDED Savings:
$20,186
Cost:
$12,534
$15,153 123,974 $5,533 1,068 $(-500) - $15,153
123,974
kWh
$5,533
1,068
MMBtu
$(-500)
-
$
TOTAL IMPLEMENTED Savings:
$16,615
Cost:
$6,234
$11,183 105,803 $5,932 1,145 $(-500) - $11,183
105,803
kWh
$5,932
1,145
MMBtu
$(-500)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes